Laserfiche WebLink
Element 8: Stabilize Channels and Outlets (2.1.8) <br /> Provide stabilization, including armoring material, adequate to prevent erosion of outlets, <br /> adjacent stream banks, slopes, and downstream reaches, will be installed at the outlets of all <br /> conveyance systems. <br /> List and describe BMPs: <br /> No channels are proposed. <br /> Installation Schedules: N/A <br /> Inspection and Maintenance plan: N/A <br /> Responsible Staff: CESCL and contractor. <br />