My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2801 35TH AVE NE 2025-04-07
>
Address Records
>
35TH AVE NE
>
2801
>
2801 35TH AVE NE 2025-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 3:43:47 PM
Creation date
3/31/2025 10:04:09 AM
Metadata
Fields
Template:
Address Document
Street Name
35TH AVE NE
Street Number
2801
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Review the SWPPP for compliance with Special Condition S9. Make appropriate <br /> revisions within 7 days of the date the discharge exceeded the benchmark. <br /> 2. Immediately begin the process to fully implement and maintain appropriate source <br /> control and/or treatment BMPs as soon as possible. Address the problems within 10 <br /> days of the date the discharge exceeded the benchmark. If installation of necessary <br /> treatment BMPs is not feasible within 10 days, Ecology may approve additional time <br /> when the Permittee requests an extension within the initial 10-day response period. <br /> 3. Document BMP implementation and maintenance in the site log book. <br /> If the turbidity exceeds 250 NTU or the transparency is 6 cm or less at any time, the following <br /> steps will be conducted: <br /> 1. Telephone or submit an electronic report to the applicable Ecology Region's <br /> Environmental Report Tracking System (ERTS) within 24 hours. <br /> https://www.ecology.wa.gov/About-us/Get-involved/Report-an-environmental-issue <br /> • Northwest Region (King, Kitsap, Island, San Juan, Skagit, Snohomish, <br /> Whatcom): (425) 649-7000 <br /> 2. Immediately begin the process to fully implement and maintain appropriate source <br /> control and/or treatment BMPs as soon as possible. Address the problems within 10 <br /> days of the date the discharge exceeded the benchmark. If installation of necessary <br /> treatment BMPs is not feasible within 10 days, Ecology may approve additional time <br /> when the Permittee requests an extension within the initial 10-day response period <br /> 3. Document BMP implementation and maintenance in the site log book. <br /> 4. Continue to sample discharges daily until one of the following is true: <br /> • Turbidity is 25 NTU (or lower). <br /> • Transparency is 33 cm (or greater). <br /> • Compliance with the water quality limit for turbidity is achieved. <br /> 0 1 - 5 NTU over background turbidity, if background is less than 50 NTU <br /> 0 1% - 10% over background turbidity, if background is 50 NTU or greater <br /> • The discharge stops or is eliminated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.