My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2801 35TH AVE NE 2025-04-07
>
Address Records
>
35TH AVE NE
>
2801
>
2801 35TH AVE NE 2025-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 3:43:47 PM
Creation date
3/31/2025 10:04:09 AM
Metadata
Fields
Template:
Address Document
Street Name
35TH AVE NE
Street Number
2801
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reporting (6.2) <br /> Discharge Monitoring Reports (6.2.1) <br /> Cumulative soil disturbance is one (1) acre or larger; therefore, Discharge Monitoring <br /> Reports (DMRs) will be submitted to Ecology monthly. If there was no discharge during a given <br /> monitoring period the DMR will be submitted as required, reporting "No Discharge". The DMR <br /> due date is fifteen (15) days following the end of each calendar month. <br /> DMRs will be reported online through Ecology's WQWebDMR System. <br /> https://www.ecology.wa.gov/Regulations-Permits/Guidance-technical-assistance/Water-quality- <br /> permits-guidance/WQWebPortal-guidance <br /> Notification of Noncompliance (6.2.2) <br /> If any of the terms and conditions of the permit is not met, and the resulting noncompliance may <br /> cause a threat to human health or the environment, the following actions will be taken: <br /> 1. Ecology will be notified within 24-hours of the failure to comply by calling the applicable <br /> Regional office ERTS phone number (Regional office numbers listed below). <br /> 2. Immediate action will be taken to prevent the discharge/pollution or otherwise stop or <br /> correct the noncompliance. If applicable, sampling and analysis of any noncompliance <br /> will be repeated immediately and the results submitted to Ecology within five (5) days of <br /> becoming aware of the violation. <br /> 3. A detailed written report describing the noncompliance will be submitted to Ecology <br /> within five (5) days, unless requested earlier by Ecology. <br /> Anytime turbidity sampling indicates turbidity is 250 NTUs or greater, or water transparency is 6 <br /> cm or less, the Ecology Regional office will be notified by phone within 24 hours of analysis as <br /> required by Special Condition S5.A of the CSWGP. <br /> • Northwest Region at (425) 649-7000 for Island, King, Kitsap, San Juan, Skagit, <br /> Snohomish, or Whatcom County <br /> Include the following information: <br /> 1. Your name and / Phone number <br /> 2. Permit number <br /> 3. City/ County of project <br /> 4. Sample results <br /> 5. Date /Time of call <br /> 6. Date /Time of sample <br /> 7. Project name <br />
The URL can be used to link to this page
Your browser does not support the video tag.