Laserfiche WebLink
Reporting (6.2) <br /> Discharge Monitoring Reports (6.2.1) <br /> Cumulative soil disturbance is one (1) acre or larger; therefore, Discharge Monitoring <br /> Reports (DMRs) will be submitted to Ecology monthly. If there was no discharge during a given <br /> monitoring period the DMR will be submitted as required, reporting "No Discharge". The DMR <br /> due date is fifteen (15) days following the end of each calendar month. <br /> DMRs will be reported online through Ecology's WQWebDMR System. <br /> https://www.ecology.wa.gov/Regulations-Permits/Guidance-technical-assistance/Water-quality- <br /> permits-guidance/WQWebPortal-guidance <br /> Notification of Noncompliance (6.2.2) <br /> If any of the terms and conditions of the permit is not met, and the resulting noncompliance may <br /> cause a threat to human health or the environment, the following actions will be taken: <br /> 1. Ecology will be notified within 24-hours of the failure to comply by calling the applicable <br /> Regional office ERTS phone number (Regional office numbers listed below). <br /> 2. Immediate action will be taken to prevent the discharge/pollution or otherwise stop or <br /> correct the noncompliance. If applicable, sampling and analysis of any noncompliance <br /> will be repeated immediately and the results submitted to Ecology within five (5) days of <br /> becoming aware of the violation. <br /> 3. A detailed written report describing the noncompliance will be submitted to Ecology <br /> within five (5) days, unless requested earlier by Ecology. <br /> Anytime turbidity sampling indicates turbidity is 250 NTUs or greater, or water transparency is 6 <br /> cm or less, the Ecology Regional office will be notified by phone within 24 hours of analysis as <br /> required by Special Condition S5.A of the CSWGP. <br /> • Northwest Region at (425) 649-7000 for Island, King, Kitsap, San Juan, Skagit, <br /> Snohomish, or Whatcom County <br /> Include the following information: <br /> 1. Your name and / Phone number <br /> 2. Permit number <br /> 3. City/ County of project <br /> 4. Sample results <br /> 5. Date /Time of call <br /> 6. Date /Time of sample <br /> 7. Project name <br />