My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7004 COLBY AVE 2025-07-31
>
Address Records
>
COLBY AVE
>
7004
>
7004 COLBY AVE 2025-07-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 9:43:37 AM
Creation date
3/31/2025 11:07:51 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
7004
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k <br /> 2018 Washington State Energy Code—Residential <br /> Prescriptive Energy Code Compliance for All Climate Zones in Washington <br /> Single Family—New&Additions(effective February 1,2021) <br /> These requirements apply to all IRC building types, including detached one- and two-family <br /> dwellings and multiple single-family dwellings(townhouses). <br /> Project Information Contact Information <br /> Colby SP Lots I l <br /> —J <br /> Instructions:This single-family project will use the requirements of the Prescriptive Path below and <br /> incorporate the minimum values listed. Based on the size of the structure,the appropriate number of <br /> additional credits are checked as chosen by the permit applicant. <br /> Provide all information from the following tables as building permit drawings:Table R402.1-Insulation and <br /> Fenestration Requirements by Component,Table R406.2-Fuel Normalization Credits and 406.3-Energy Credits. <br /> Authorized Representative Date <br /> All Climate Zones(Table R402.1.1) <br /> R-Value' U-Factor' <br /> Fenestration U-Factor b n/a 0.30 <br /> Skylight U-Factor b n/a 0.50 <br /> Glazed Fenestration SHGC bje n/a n/a <br /> !Ceiling` 49 J 0.026 <br /> Wood Frame Wall g.h 21 mt 0.056 <br /> Floor 30 0.029 <br /> Below Grade Wall cm 10/15/21 int+TB _ 0.042 <br /> Slab d,f R-Value&Depth j 10,2 ft n/a <br /> R-values are minimums. U-factors and SHGC are maximums.When insulation is installed in a cavity that is less <br /> a than the label or design thickness of the insulation,the compressed R-value of the insulation from Appendix <br /> Table A101.4 shall not be less than the R-value specified in the table. <br /> b The fenestration U-factor column excludes skylights. <br /> "10/15/21+5TB" means R-10 continuous insulation on the exterior of the wall,or R-15 continuous insulation on <br /> 'the interior of the wall,or R-21 cavity insulation plus a thermal break between the slab and the basement wall at <br /> c the interior of the basement wall. "10/15/21+5TB" shall be permitted to be met with R-13 cavity insulation on <br /> the interior of the basement wall plus R-5 continuous insulation on the interior or exterior of the wall. "5TB" <br /> means R-5 thermal break between floor slab and basement wall. <br /> d R-10 continuous insulation is required under heated slab on grade floors.See Section R402.2.9.1. <br /> For single rafter-or joist-vaulted ceilings,the insulation may be reduced to R-38 if the full insulation depth <br /> e extends over the top plate of the exterior wall. <br /> R-7.5 continuous insulation installed over an existing slab is deemed to be equivalent to the required perimeter <br /> f slab insulation when applied to existing slabs complying with Section R503.1.1. If foam plastic is used, it shall <br /> meet the requirements for thermal barriers protecting foam plastics. <br /> For log structures developed in compliance with Standard ICC 400, log walls shall meet the requirements for <br /> g climate zone 5 of ICC 400. <br /> Int. (intermediate framing)denotes framing and insulation as described in Section A103.2.2 including standard <br /> h framing 16 inches on center, 78%of the wall cavity insulated and headers insulated with a minimum of R-10 <br /> insulation. <br /> [-,-- ,, ,,...,v,-.,.-7,, <br /> APR 0 3 2023 J <br /> Prescriptive Path—Single Family 2018 Washington State Energy Code-R CITY OF E\(ERETT <br /> Permit Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.