Laserfiche WebLink
2022 Stormwater System Development Fee Calculations <br /> Permit#: PW2205-009 Additional Notes: <br /> Project Address: Stormwater system development fees split on two separate permits:ground hard surfaces <br /> Project Name: calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br /> Answer the Following Questions(Required):All Yellow Inputs <br /> Water District: Everett <br /> Sewer District: Everett Prepared By: Tawnya Herman Date: 5/25/2022 <br /> Outside City Limits? No *Adds a 25%Surcharge <br /> Supportive Housing Credit? No *Reduces by 80% lReviewed By: Date: <br /> Fee Calculations: <br /> Stormwater System Development Fees: <br /> Permit#: BXXXX-XXX Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: SF <br /> Stormwater System Dev Fee: $0.00 Add this fee to the Building Permit for roof area hard surfaces. <br /> Stormwater System Development Fees: <br /> Permit#: PW220S-009 Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: 170 1 SF <br /> Stormwater System Dev Fee: $45.53 Add this fee to the Public Works Permit for hard surfaces on the ground. <br />