Laserfiche WebLink
PUBLIC WORKS PERMIT Date Applied: 3/24/2023 <br /> City of Everett Permit Services Public Works Permit#: PW2303-017 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> EV E R E T T Everett, WA 98201 Planning Reference#: REV1122-047 <br /> everettwa.gov/permits Public Works Fee: $685.00 <br /> WASHINGTON Perm itSeryices@eyerettwa.goy Schedule Inspections at:onlinepermits.everettwa.gov <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> PACIFIC RIDGE HOMES-DRH, LLC MERLE ASH/LAND TECHNOLOGIES, INC <br /> 17921 BOTHELL EVERETT HWY STE 100 <br /> BOTHELL,WA 98012 <br /> PHONE:4259391150 PHONE: 3606529727 <br /> SITE ADDRESS:9506 7TH AVE SE TAX PARCEL ID#:28051800302100 <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> DESCRIPTION:CLEARING AND GRADING FOR CHELSEA HEIGHTS <br /> PERMIT CONDITIONS: <br /> 1. All inspections shall be scheduled online at https://onlinepermits.everettwa.gov.Available inspection dates are shown in the dropdown <br /> menu. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department.Approved plans must remain on job-site at <br /> all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at onlinepermits.everettwa.gov to formally <br /> request all required inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Any damage to City improvements(sidewalk,curb,roadway,etc.)shall be replaced per City Standards and/or as directed by the City PW <br /> Inspector. <br /> 7. City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense.This work to be <br /> under a separate Utility Permit to be purchased at the Permit Services Counter per a cost estimate by the Water Department.Work shall be <br /> scheduled 3-4 weeks in advance. <br /> 8. Prior to any disturbance of the site,the applicant shall post temporary signs for the location of the Critical areas and buffers to ensure the <br /> critical area is not disturbed during clearing and grading. <br /> 9. Prior to any interruption to the public right-of-way(roadways,parking lanes,or sidewalks)a Traffic Street Use permit shall be obtained <br /> from the City's Traffic Engineering Division.This permit can be applied for online at onlinepermits.everettwa.gov and requires a traffic <br /> control plan to be submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br /> 10. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by selecting <br /> PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests when all items have been completed for this <br /> permit. <br /> PERMIT FEE BREAKDOWN: <br /> Erosion Control ....................................................................$200.00 <br /> Grade/Fill/Excavate(20,000 CY)...........................................$445.00 <br /> PW Plan Review......................................................................$20.00 <br /> PW Site Inspection.................................................................$20.00 <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant hereby agrees to hold and save harmless the City of Everett from any and <br /> all claims for damages,costs,expenses,or causes of action that may arise because of installation and maintenance of the improvement or other <br /> right-of-way use here to applied for and further agrees to remove same upon notice from the City and to replace public property damaged <br /> thereby. <br /> VALIDITY/EXPIRATION: <br /> Work authorized by this permit must be started within 180 days of date permit is issued and thereafter is to be diligently pursued to completion. <br /> This permit may be canceled by the city upon any stoppage of work on this project over 180-day duration.Each inspection extends the expiration <br /> date 180 days to keep the permit open while work is active. <br /> Page 1 of 1 <br /> _APPLICANT/JOB SITE COPY _ADDRESS FILE _TREASURER <br />