My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2313 COLUMBIA AVE 2025-06-25
>
Address Records
>
COLUMBIA AVE
>
2313
>
2313 COLUMBIA AVE 2025-06-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2025 11:53:43 AM
Creation date
4/1/2025 1:54:58 PM
Metadata
Fields
Template:
Address Document
Street Name
COLUMBIA AVE
Street Number
2313
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From: Thad Newport <br /> Sent: Tuesday,September 6, 2022 4:14 PM <br /> To: jeff kildare <br /> Subject: RE: [EXTERNAL] Re: B2209-004 2313 COLUMBIA AVE <br /> The site plan submitted with the building permit will need to be updated to show the proposed paver <br /> area including dimensions and square footage because the parking area will be something the planning <br /> department will want to verify before they approve the building permit. <br /> — j.`4 `"o, Thad Newport <br /> - Associate Engineer I Permit Services <br /> �'tvp�� <br /> 425.257.8810 13200 Cedar Street, 2"d Floor, Everett, WA 98201 <br /> EVERETT Phone Hours: M/W/Th: 8 a.m.—12 p.m & 1 p.m.—3 p.m. <br /> everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant <br /> to the Public Records Act. <br /> From:jeff kildare<jeffropk@yahoo.com> <br /> Sent:Tuesday, September 6, 2022 3:57 PM <br /> To:Thad Newport<TNewport@everettwa.gov> <br /> Subject: [EXTERNAL] Re: B2209-004 2313 COLUMBIA AVE <br /> CAUTION:This email originated from outside of the organization. Do not click links or open attachments <br /> unless you recognize the sender and know the content is safe. <br /> hi <br /> It's an existing dadu that I'm going to tear down and put up the new one. As far as the parking spot i can <br /> put in pavers after I'm done putting up the new building. <br /> thank you <br /> Jeffery <br /> On Tuesday, September 6, 2022 at 03:35:06 PM PDT, Thad Newport<tnewport(c)-everettwa.gov> wrote: <br /> Jeffery, <br /> I am doing the Public Works review on your DADU building permit submittal and need additional <br /> information. It looks like this is a permit for a new DADU, but the aerial imagery shows a structure in this <br /> location. Is this a conversion of an existing building into an accessory dwelling unit? Is there any <br /> proposed paving as part of this project?All required parking spaces as determined by the planning <br /> department are required to be on durable surfacing (concrete, asphalt, pavers, not gravel). <br />
The URL can be used to link to this page
Your browser does not support the video tag.