My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9826 7TH AVE SE 2025-06-25
>
Address Records
>
7TH AVE SE
>
9826
>
9826 7TH AVE SE 2025-06-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2025 11:13:52 AM
Creation date
4/1/2025 1:59:20 PM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
9826
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT <br />City of Everett Permit Services <br />3200 Cedar Street, 2nd Floor <br />EV E R E T T <br />Everett, WA 98201 <br />everettwa.gov/permits <br />WASHINGTON <br />PermitServices@everettwa.gov <br />OWNER NAME AND ADDRESS: <br />NELSON FAMILY PROPERTIES LLC <br />22422 STATE ROUTE 9 NE <br />ARLINGTON, WA 98223 <br />PHONE: <br />Date Applied: 10/27/2022 <br />Public Works Permit #: PW2210-016 <br />Associated Bldg Permit #: <br />Planning Reference #: <br />Public Works Fee: $571.65 <br />Schedule Inspections at: onlinepermits.everettwa.gov <br />APPLICANT NAME AND ADDRESS: <br />TIM SLOTTA <br />PHONE: 2064595775 <br />SITE ADDRESS: 9826 7TH AVE SE TAX PARCEL ID #: 28051800307300 <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />DESCRIPTION: NELSON PETROLEUM - ILLICIT DISCHARGE FINAL SITE WORK <br />PERMIT CONDITIONS: <br />1. All inspections shall be scheduled online at https://onlinepermits.everettwa.gov. Available inspection dates are shown in the dropdown <br />menu. <br />2. All work shall be performed in accordance with the permit and current City of Everett 'Design and Construction Standards and <br />Specifications for Development'. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department. Approved plans must remain on job -site at <br />all times. <br />5. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at onlinepermits.everettwa.gov to formally <br />request all required inspections. <br />6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector and the approved <br />SWPPP/TESC Plan. Remove upon completion of the project prior to final approval of the permit. <br />7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br />8. Protect all existing underground utilities during construction. <br />9. Any damage to City improvements (sidewalk, curb, roadway, etc.) shall be replaced per City Standards and/or as directed by the City PW <br />Inspector. <br />10. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be managed on -site <br />in a manner that does not adversely affect neighboring properties, including the City's right-of-way and/or easements and the <br />improvements located therein. <br />11. Former Pacific Pride fueling stations on east side of site are to be locked and covered until such time as the site is brought into compliance <br />as a fueling station. <br />12. Nelson to perform investigation and provide results/documentation to verify the source of the 2-inch pipe discharging to the Pacific Pride <br />catch basin. Nelson shall schedule testing with Permit Services, and the Surface Water Inspector will be present during the investigation to <br />meet this condition. <br />13. Provide updated as -built plans to reflect site changes to the stormwater conveyance system as well as existing structures to remain. <br />14. Site uses shall be conducted such that the requirements are satisfied per the Stormwater Management Manual for Western Washington <br />(SWMMWW) and City of Everett Design and Construction Standards and Specifications (DCSS), Section 4.5. <br />15. Prior to site modifications or changes of use, the owner shall determine if retrofits to the stormwater system are required per the most <br />currently adopted SWMMWW and DCSS. <br />16. Any modifications to the stormwater system will require a new Public Works permit [EMC 14.28.120]. <br />17. Prior to any interruption to the public right-of-way (roadways, parking lanes, or sidewalks) a Traffic Street Use permit shall be obtained <br />from the City's Traffic Engineering Division. This permit can be applied for online at onlinepermits.everettwa.gov and requires a traffic <br />control plan to be submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br />18. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by selecting <br />PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests for this permit when all items have been <br />completed. <br />Page 1 of 2 <br />_APPLICANT/JOB SITE COPY _ADDRESS FILE _TREASURER <br />
The URL can be used to link to this page
Your browser does not support the video tag.