My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9826 7TH AVE SE 2025-06-25
>
Address Records
>
7TH AVE SE
>
9826
>
9826 7TH AVE SE 2025-06-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2025 11:13:52 AM
Creation date
4/1/2025 1:59:20 PM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
9826
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />Existing <br />- <br />a. Provide a separate plan for the existing conditions <br />Conditions <br />and include the following: <br />Figure <br />• Label all structures (e.g., oil/water <br />separators, oil stop valve, containment vault, <br />• Done <br />closed or open grate CB). <br />• Indicate where the roof and canopy <br />• The roof drain lines are connected to the <br />downspouts tie into the system. <br />existing fuel island CBs and called out at the <br />Include flow arrows or topographic <br />structures. <br />information as needed to indicate the direction of <br />• Done <br />flow onsite. <br />• Show the outfall pipe and discharge <br />• Out fall is shown along the westerly <br />location. <br />property line and goes under the existing <br />b. Provide a separate figure showing the existing plan <br />building. Notes added to plan. <br />with catchment areas highlighted to show which areas <br />flow to each catch basin. <br />Done <br />4 <br />Project <br />- <br />a. Revise the proposed plan to include the following: <br />Conditions <br />. Label all structures e. <br />( g., oil/water separator, <br />• Done oil stop valve will be removed <br />p <br />Figure <br />oil stop valve, containment vault). <br />from the structure after storm pipe <br />• Include flow arrows or topographic <br />reconfiguration in final design. <br />information as needed to indicate the <br />• Done <br />direction of flow onsite. <br />• Indicate where the roof and canopy <br />• All observed pipes are called out at the <br />downspouts tie into the system. <br />existing CBs <br />• Show the outfall pipe and discharge location. <br />• Added callout for clarity. <br />• Indicate the amount of replaced hard surfaces. <br />. Only replaced hard surface is for the <br />b. Provide a separate figure showing the proposed plan <br />storm/sewer pipe installation. <br />with catchment areas highlighted. <br />Done <br />Page 7 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.