My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Boadus Pride LLC 4/1/2025
>
Contracts
>
Small Works Roster Contracts and Change Orders
>
Small Works Roster Contracts and Change Orders
>
Boadus Pride LLC 4/1/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 2:02:53 PM
Creation date
4/1/2025 2:02:30 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Boadus Pride LLC
Approval Date
4/1/2025
End Date
5/30/2025
Department
Finance
Department Project Manager
Jenny Chang
Subject / Project Title
Thornton A. Sullivan Park Float Renovation
Tracking Number
0004748
Total Compensation
$86,271.50
Contract Type
Small Works Roster Contracts and Change Orders
Contract Subtype
Small Works Roster Contracts and Change Orders
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Small Works Contract - 1 <br />SMALL WORKS CONTRACT <br /> <br />THIS CONTRACT is dated and effective as of the date of the Mayor’s signature below and is by <br />and between the City of Everett, a Washington municipal corporation (the “City”), and the Contractor <br />shown below in the Basic Provisions. <br /> <br />1. Basic Provisions: <br />Solicitation Name 2024-162 Thornton A. Sullivan Park Float Renovation <br />Brief Description of <br />Work <br />This project includes repairs to three existing floats at Thornton A. Sullivan Park. <br />The structures, including steel pilings, will not be extended, converted, or <br />altered beyond their existing size or footprint. <br />Contractor <br />Boadus Pride LLC <br />801 SW 16th Street Suite 115 <br />Renton, WA 98057 <br />office@boadus.com <br />City <br />Project <br />Manager <br />Lolly Huggins <br />City of Everett – Parks and Facilities <br />802 E. Mukilteo Blvd <br />Everett, WA 98203 lhuggins@everettwa.gov <br />Contract Time The Work shall be physically complete in all respects and ready for final <br />acceptance no later than May 30, 2025. This date is not flexible and work <br />cannot be extended past this date. <br />Contract Price $86,271.50 <br />Contract <br />Documents <br />The following documents (“Contract Documents”) are incorporated by <br />reference and are hereby made a part of this Contract: this Contract <br />document; Invitation for Quote and addenda thereto, including without <br />limitation any Instructions, General Conditions, Specifications, <br />Contractor Commitment and Information, Price Sheet, Certification of <br />Compliance, Minority Business Certification, Contractor References, and <br />any other document included in the Invitation to Quote ; change orders; <br />all provisions required by law, and the following document(s), if any: <br />N/A <br />Contractor’s response to the solicitation is a Contract Document, but only <br />
The URL can be used to link to this page
Your browser does not support the video tag.