H AAC K 741rH
<br />SECTION 8, TOWNSHIP 28N, RANGE 5E, W.M.
<br />\ \ S \ \ \ \ \ I 355, -..
<br />I p \ ARROW
<br />\ \ \ \ \ \ \ \ ^ \ J1 FS-
<br />.L. \ \ PROP, SF'R
<br />\ \ (2,014�SF7\ \ \ \ \\ \\
<br />BLOCKS
<br />AREA 'A' �\ 1
<br />\5,0135F \3,1, II
<br />/ :p I \� BERM P601L
<br />\ \ I
<br />r
<br />r
<br />4 LI
<br />5 AEI(. SFR
<br />,Ir �
<br />11111
<br />/PROP. ^•,i: ..'�•'• \ \ \\ \\
<br />O(1J2 OSF) •:.' ...,. \\ \\ \\ \\ \
<br />`' , , �.... •.a ^ Show dispersi n \ \ \ \
<br />/ / /I ,,'''"'----_.,• „/ // I •• trench and / incl de detail from �) I \\
<br />1 \
<br />SWMMWW / I 1
<br />/ 1 \
<br />._..J. ' w - w —'N w w — w / W _.__ w —
<br />l I �- T fIa' -_W- w-.__w .-w--W/ _ w -\ -W.—W•
<br />__-54 -i-SS ®--rss. --s� --�5 --I-ss ---ss pAVEMf NT
<br />1 \ \ \ 74TFI
<br />.._... W_ ..�..__.,...-.. W . \ W -'—\- W -�.. W.....
<br />' -t-w-- w- -w „_ W .- w_. -.W_.. -W
<br />\ \ \ 1 W . -., W L__..._. W -...-t W - - ._l_ -._ W W --1 _... w w -
<br />\ \ \ I \ 1 X 1
<br />-
<br />\\ 1 I I I I 1 I \
<br />BASIC SOIL AMENDMENT NOTES
<br />SOIL RETENTION. RETAIN, IN AN UNDISTURBED STATE, THE DUFF LAYER AND NATIVE TOPSOIL TO THE MAXIMUM EXTENT PRACTICABLE. IN
<br />ANY AREAS REQUIRING GRADING REMOVE AND STOCKPILE THE DUFF LAYER AND TOPSOIL ON SITE IN A DESIGNATED, CONTROLLED AREA,
<br />NOT ADJACENT TO PUBLIC RESOURCES AND CRITICAL AREAS, TO BE REAPPLIED TO OTHER PORTIONS OF THE SITE WHERE FEASIBLE.
<br />SOIL QUALITY. ALL AREAS SUBJECT TO CLEARING AND GRADING THAT HAVE NOT BEEN COVERED BY IMPERVIOUS SURFACE, INCORPORATED
<br />INTO A DRAINAGE FACILITY OR ENGINEERED AS STRUCTURAL FILL OR SLOPE SHALL, AT PROJECT COMPLETION, DEMONSTRATE THE
<br />FOLLOWING:
<br />1. A TOPSOIL LAYER WITH A MINIMUM ORGANIC MATTER CONTENT OF 10% DRY WEIGHT IN PLANTING BEDS, AND 5% ORGANIC MATTER
<br />CONTENT IN TURF AREAS, AND A PH FROM 6.0 TO 8.0 OR MATCHING THE PH OF THE UNDISTURBED SOIL. THE TOPSOIL LAYER SHALL
<br />HAVE A MINIMUM DEPTH OF EIGHT INCHES EXCEPT WHERE TREE ROOTS LIMIT THE DEPTH OF INCORPORATION OF AMENDMENTS NEEDED
<br />TO MEET THE CRITERIA. SUBSOILS BELOW THE TOPSOIL LAYER SHOULD BE SCARIFIED AT LEAST 4 INCHES WITH SOME INCORPORATION
<br />OF THE UPPER MATERIAL TO AVOID STRATIFIED LAYERS, WHERE FEASIBLE.
<br />2. MULCH PLANTING BEDS WITH 2 INCHES OF ORGANIC MATERIAL
<br />3. USE COMPOST AND OTHER MATERIALS THAT MEET THESE ORGANIC CONTENT REQUIREMENTS:
<br />a. THE ORGANIC CONTENT FOR 'PRE -APPROVED" AMENDMENT RATES CAN BE MET ONLY USING COMPOST MEETING THE COMPOST
<br />SPECIFICATION FOR BMP T7.30: BIORETENTION CELLS, SWALES, AND PLANTER BOXES (P.959), WITH THE EXCEPTION THAT THE
<br />COMPOST MAY HAVE UP TO 35% BIOSOLIDS OR MANURE. THE COMPOST MUST ALSO HAVE AN ORGANIC MATTER CONTENT OF 40% TO
<br />65%, AND A CARBON TO NITROGEN RATIO BELOW 25:1. THE CARBON TO NITROGEN RATIO MAY BE AS HIGH AS 35:1 FOR PLANTINGS
<br />COMPOSED ENTIRELY OF PLANTS NATIVE TO THE PUGET SOUND LOWLANDS REGION.
<br />b. CALCULATED AMENDMENT RATES MAY BE MET THROUGH USE OF COMPOSTED MATERIAL MEETING (A.) ABOVE; OR OTHER ORGANIC
<br />MATERIALS AMENDED TO MEET THE CARBON TO NITROGEN RATIO REQUIREMENTS, AND NOT EXCEEDING THE CONTAMINANT LIMITS
<br />IDENTIFIED IN TABLE 220-B, TESTING PARAMETERS, IN WAC 173-350-220.
<br />THE RESULTING SOIL SHOULD, BE CONDUCIVE TO THE TYPE OF VEGETATION TO BE ESTABLISHED.
<br />IMPLEMENTATION OPTIONS: THE SOIL QUALITY DESIGN GUIDELINES LISTED ABOVE CAN BE MET BY USING ONE OF THE METHODS LISTED
<br />BELOW:
<br />1. LEAVE UNDISTURBED NATIVE VEGETATION AND SOIL, AND PROTECT FROM COMPACTION DURING CONSTRUCTION.
<br />2. AMEND EXISTING SITE TOPSOIL OR SUBSOIL EITHER AT DEFAULT PRE-APPROVED'RATES, OR AT CUSTOM CALCULATED RATES BASED
<br />ON TESTS OF THE SOIL AND AMENDMENT.
<br />3. STOCKPILE EXISTING TOPSOIL DURING GRADING, AND REPLACE IT PRIOR TO PLANTING. STOCKPILED TOPSOIL MUST ALSO BE AMENDED
<br />IF NEEDED TO MEET THE ORGANIC MATTER OR DEPTH REQUIREMENTS, EITHER AT A DEFAULT PRE- APPROVED -RATE OR AT A CUSTOM
<br />CALCULATED RATE.
<br />4. IMPORT TOPSOIL MIX OF SUFFICIENT ORGANIC CONTENT AND DEPTH TO MEET THE REQUIREMENTS.
<br />MORE THAN ONE METHOD MAY BE USED ON DIFFERENT PORTIONS OF THE SAME SITE. SOIL THAT ALREADY MEETS THE DEPTH AND
<br />ORGANIC MATTER QUALITY STANDARDS, AND IS NOT COMPACTED, DOES NOT NEED TO BE AMENDED.
<br />AREA A ❑ AREA B
<br />STOCKPILE AND UNCOMPACTED, UNGRADED,
<br />AMEND SOIL IF UNDISTURBED
<br />NECESSARY "OPTION 3"
<br />BASIC DRAINAGE NOTES
<br />1. NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED, OR PUT INTO USE
<br />UNTIL IT HAS BEEN INSPECTED, TESTED, AND ACCEPTED BY THE CITY OF EVERETT.
<br />2. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT DESIGN AND
<br />CONSTRUCTION STANDARDS AND SPECIFICATIONS AND THE WSDOT/APWA STANDARD
<br />SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION (CURRENT EDITION).
<br />3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE
<br />RECORDS AND ARE SHOWN FOR CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE
<br />FOR VERIFICATION OF LOCATIONS AND TO AVOID DAMAGE TO ANY ADDITIONAL UTILITIES
<br />SHOWN. IF CONFLICTS WITH EXISTING UTILITIES ARISE DURING CONSTRUCTION, THE
<br />CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR AND ANY CHANGES REQUIRED
<br />SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO COMMENCEMENT OF RELATED
<br />CONSTRUCTION ON THE PROJECT.
<br />4. ALL STORM SYSTEMS WITHIN THE PUBLIC RIGHT-OF-WAY OR IN EASEMENTS MUST BE
<br />STAKED BY SURVEY FOR LINE AND GRADE PRIOR TO STARTING CONSTRUCTION.
<br />5. ALL CATCH BASIN GRATES MUST BE STENCILED OR STAMPED "DUMP NO WASTE, DRAINS TO
<br />STREAM, LAKE, RIVER, PUGET SOUND, OR WETLAND." CHOOSE APPROPRIATE FEATURE FOR
<br />THE PROJECT.
<br />N
<br />0 20 _ 40
<br />I/II
<br />HORIZONTAL SCALE
<br />15
<br />Know what's below.
<br />Call two business
<br />days before you dig.
<br />V
<br />Z J
<br />1 1 IL
<br />0
<br />N CO
<br />¢ GO
<br />Lu Oi
<br />Q� E0
<br />N
<br />0
<br />N N
<br />kvv
<br />N
<br />Z z
<br />0 N
<br />2IL
<br />z co
<br />_
<br />z
<br />= Z
<br />o00
<br />3
<br />Y L
<br />U W
<br />W
<br />WI
<br />W co
<br />W 0
<br />L z
<br />Z
<br />2 U O
<br />U
<br />F- O a
<br />22-0807 -""JMS
<br />w,... 9/26/2022
<br />5C4E. 1" = 20'
<br />
|