Laserfiche WebLink
2022 Stormwater System Development Fee Calculations <br /> Permit#: B2210-019 Additional Notes: <br /> Project Address: 2413 74TH ST SE Stormwater system development fees split on two separate permits:ground hard surfaces <br /> Project Name: Haack Bros SFR calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br /> Answer the Following Questions(Required):All Yellow Inputs <br /> Water District: Everett <br /> Sewer District: Everett Prepared By: Tawnya Herman Date: 10/28/2022 <br /> Outside City Limits? No *Adds a 25%Surcharge <br /> Supportive Housing Credit? No *Reduces by 80% Reviewed By: v Date: i l lz. t it. <br /> Fee Calculations: <br /> Stormwater System Development Fees: <br /> Permit#: B2210-019 Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: 2,014 SF <br /> Stormwater System Dev Fee: $539.35 Add this fee to the Building Permit for roof area hard surfaces. <br /> Stormwater System Development Fees: <br /> Permit#: PW2210-001 Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: 1,253 SF <br /> Stormwater System Dev Fee: $335.55 Add this fee to the Public Works Permit for hard surfaces on the ground. <br />