My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4929 SOUND AVE 2025-09-19
>
Address Records
>
SOUND AVE
>
4929
>
4929 SOUND AVE 2025-09-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2025 4:18:43 PM
Creation date
4/2/2025 10:13:58 AM
Metadata
Fields
Template:
Address Document
Street Name
SOUND AVE
Street Number
4929
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�lJi11 Washington Sto:;to Energy Code—Reside;;u; , <br /> Prescriptive Energy Code Compliance for All Climate Zorres in Washington <br /> Single Family—New&Additions(effective February 1,2021) <br /> Table 406.3—Energy Credits(Single Family) <br /> Option Demcription Credits:SF <br /> 2.AIR LEAKAGE CONTROL AND EFFICIENT VENTILATIOPil OPTIONS <br /> Only cane option from Items 2.:I through 2.4 may be selected in this category. <br /> Compliance based on R402.4.1.2:Reduce the tested air leakage to 21.0 air changes per hour <br /> maximum at 50 Pa:icals or <br /> For R-2 Occupancies, optional compliance based on Section R402.4.11..2: Reduce the tested <br /> air leakage to 0.3 rim/sf maximum at 50 Poiscals and <br /> All whole house ventilation requirements as determined by Section M1507.3 of the <br /> International Residential Code or Section 443.8 of the International i,4echanical Code shall <br /> 2.1 be met with a high efficiency fan(s)(maximum 0.35 watts/cfm), not interlocked with the 0.5 <br /> furnace fan(if present).Ventilation system: using a furnace including an ECM motor are <br /> allowed, provided-:hat they are controlled lo operate at low speed in ventilation only <br /> mode. <br /> To qualify to claim this credit,the building l::ermit drawings shall specify the option being <br /> selected and the maximum tested building air leakage,and shall show the qualifying <br /> ventilation system and its control sequence of operation. <br /> Compliance based on Section R402.4.1.2: Reduce the tested air leakage to 2.0 air changes <br /> per hour maximum at 50 Pascals or <br /> For R-2 Occupancies,optional compliance based on Section R402.4.1.2: Reduce the tested <br /> 2.2 air leakage to 0.25 cfm/sf maximum at 50 P ascals and 1.0 <br /> All whole house ventilation requirements as determined by Section M1507.3 of the <br /> International Residential Code or Section 4:3.8 of the International ,4echonical Code shall <br /> be met with a heal:recovery ventilation sysl:em with minimum sensible heat recovery <br /> efficiency of 0.65. ' <br /> Compliance based on Section R402.4.1.2: <br /> Reduce the tested air leakage to 1.5 air changes per hour maximum at 50 Pascals or <br /> For R-2 Occupancies,optional compliance based on Section R402.4,1.2: Reduce the tested <br /> 2,3 air leakage to 0.25 cfm/sf maximum at 50 Pascals and 1.5 <br /> All whole house ventilation requirements as determined by Section M1507.3 of the <br /> International Residential Code or Section 4C3.8 of the International i,4echanical Code shall <br /> be met with a heal:recovery ventilation sysl:em with minimum sensible heat recovery <br /> efficiency of 0.75. ' <br /> Compliance based on Section R402.4.1.2: <br /> Reduce the tested air leakage to 0.6 air cha riges per hour maximum at 50 Pascals or <br /> For R-2 Occupancies,optional compliance based on Section R402.4.:1..2: Reduce the tested <br /> 2 ,;I air leakage to 0.15 cfm/sf maximum at 50 Pascals and 2.0 <br /> All whole house ventilation requirements as determined by Section M1507.3 of the <br /> International Residential Code or Section 4C3.8 of the International Mechanical Code shall <br /> be met with a heat:recovery ventilation sysl:em with minimum sensible heat recovery <br /> efficiency of 0.80. Duct installation shall comply with Section R403.3.7.1 <br /> 1 To qualify to claim this credit,the building permit drawings shall specify the option being selected and shall <br /> specify the maximum tested building air leakage and shall show the heat recovery ventilation system. <br /> Prescri:tive Path—Single Family 2018 Washington State Energy Code-R 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.