CHANGE ORDER # <br />Project (Procurement) Number: Small Works Roster Project Title: <br />IFQ 2024-113 Clark Park Renovation and Off-Leash Dog Area <br />Description of Change: (Attach contractor change proposal and cost schedule) (Attach Price or Cost Analysis) <br />BUILDING/LOCATION: 2400 Lombard Avenue, Everett, WA 98201 <br />This change order decreases the total project price. The two changes are as follows. <br />1. Eliminate mow strip concrete curbing work due to the sensitivity of the area from an unknown pressurized <br />sewer pipe in the right-of-way on 25 <br />th Street,which was not identified until the contractor began conducting <br />utility locates. <br />2. The Public Works Department requires an alternative method to perform the post hole digging for the <br />fence posts in the right of way for approximately 173 linear feet along the 25th Street section. The <br />discovery of the pressurized pipe requires precision digging instead of machine work to set the fence posts <br />-effective method to complete the work is by Vactor <br />truck which will provide precise hole-digging based on depth and circumference. <br />The changes described above result in the following adjustment(s) in price and contract time (in calendar days). <br />* Total Project Price Prior to this Change, <br />including tax $406,676.29 Contract Time & Completion Date Prior <br />to This Change 180 <br />Completion Date <br />Prior <br />05/18/25 <br />* Net (Increase) or (Decrease) Resulting from <br />this Change, including tax -$2,494.73 Net (Increase) or (Decrease) Resulting <br />from this Change 0 <br />* Total Project Price Including this Change, <br />including tax $404,181.60 Contract Time & Completion Date <br />Including This Change 180 <br />Completion Date <br />After <br />05/18/25 <br />By signing below, City of Everett and the Contractor agree that the Contract work shall be changed to the extent described in <br />all such <br />changes, including all direct and indirect costs and impacts. The City of Everett and the Contractor further agree that <br />Contract time shall be adjusted to the extent shown above. This Change Order only changes the contract between City of <br />Everett and the Contractor to the extent explicitly provided in this Change Order. Signatures on this change order may be ink, <br />scanned pdf signature, or other electronic means (such as AdobeSign). <br />CONTRACTOR CITY OF EVERETT <br />Reaper Construction, Inc. <br />17903 29th Avenue NE <br />Marysville, WA 98271 <br />City of Everett <br />3200 Cedar Street <br />Everett, WA 98201 Date <br />Project Manager: <br />Division Manager: <br />Department Director: <br />Name & Title:Raine Smiley, President City Attorney Template Approved as to Form 7.14.23 <br />Date:Mayor: <br />*WA Use Tax on materials included. WAC 458-20-171 <br />Attest: ___________________________ <br />Office of the City Clerk <br />0003 <br />04/01/2025 04/02/2025