Laserfiche WebLink
Kierstein Residence Retaining Wall <br />Everett Washington Geotechnical Engineering Report <br />SIERRASCAPE WALL RECOMMENDATIONS FOR DESIGN AND CONSTRUCTION <br />Wall Design <br />Associated Earth Sciences, Inc. (AESI) designed the planned SierraScape wall based on <br />discussions with you and available subsurface information. We designed the SierraScape wall <br />using the computer software program MSEW Version 3.0. We analyzed global stability of the <br />wall using the software program Slope/W Version 8.16 by GeoSlope International. Soil <br />parameters were derived based on the soils encountered in our borings, established <br />correlations, prior laboratory testing, and previous experience in similar soils in the Puget <br />Sound area. For seismic design we used a peak ground acceleration (PGA) of 0.652g. For global <br />stability we used a PGA reduced by 50 percent. Our analysis indicates that that the wall will <br />require geogrid (Tensar UX110OMSE or approved equivalent) having a length approximately <br />equal to the total wall height. Calculations supporting the design of the wall are included in <br />Appendix B at the end of this letter -report. Construction plan sheets G1 and G2 are presented <br />separately from this report. <br />Site Preparation <br />Site preparation of the area for the new retaining wall should include removal of all organic <br />debris, and any other deleterious material. Areas where looser native soils exist should be <br />recompacted in place, or if this is not feasible due to either soil composition or moisture <br />content, the loose soils should be removed and replaced as subsequently recommended for <br />structural fill placement. <br />In our opinion, stable construction slopes should be the responsibility of the contractor and <br />should be determined during construction. For estimating purposes, we anticipate that <br />temporary, unsupported cut slopes in the advance outwash may be made at a maximum slope <br />of 1H:1V (Horizontal:Vertical). In existing fill soils or slide debris, we recommend temporary cut <br />slopes inclined at 1.5H:1V. As is typical with earthwork operations, some sloughing and raveling <br />may occur, especially if groundwater seepage is present in temporary cut slopes and <br />inclinations may have to be adjusted in the field. In addition, WISHA/OSHA regulations should <br />be followed at all times. <br />Based on our observations, the on -site soils have a low to moderate percentage of fine-grained <br />material making them slightly to moderately moisture -sensitive and subject to disturbance <br />when wet. The contractor must use care during site preparation and excavation operations so <br />that the underlying soils are not softened. If disturbance occurs, the softened soils should be <br />removed and the area brought to grade with structural fill. Any exposed soils should also be <br />protected with plastic sheeting during the winter months. <br />July 1, 2022 ASSOCIATED EARTH SCIENCES, INC. <br />SASlih - 20180614EO01-002 Page 6 <br />