Laserfiche WebLink
g. If applicable,what is the current shoreline master program designation of the site? <br /> Not applicable. <br /> h. Has any part of the site been classified as a critical area by the city or county? If so,specify. <br /> No. <br /> i. Approximately how many people would reside or work in the completed project? <br /> Approximately 200 people would live in the facility with roughly 4 employees. <br /> j. Approximately how many people would the completed project displace? <br /> The completed project will not displace anyone. <br /> k. Proposed measures to avoid or reduce displacement impacts,if any: <br /> None warranted. <br /> L.Proposed measures to ensure the proposal is compatible with existing and projected land <br /> uses and plans,if any: <br /> The proposed use has been confirmed to meet zoning requirements and will adhere to the City <br /> of Everett's planning and development standards as needed. <br /> m.Proposed measures to reduce or control impacts to agricultural and forest lands of long-term <br /> commercial significance,if any: <br /> None warranted. <br /> 9. Housing <br /> a. Approximately how many units would be provided,if any? Indicate whether high,mid- <br /> dle,or low-income housing. <br /> 140 units will be provided. All units are targeted for middle and high income housing. <br /> b. Approximately how many units,if any,would be eliminated?Indicate whether high, <br /> middle,or low-income housing. <br /> 4 units will be eliminated. <br /> c. Proposed measures to reduce or control housing impacts,if any: <br /> None warranted. <br /> 10. Aesthetics <br /> a. What is the tallest height of any proposed structure(s),not including antennas; what is <br /> the principal exterior building material(s)proposed? <br /> Tallest height is 74'10"with metal siding as the principal exterior building material. <br /> SEPA Environmental checklist(WAC 197-11-960) July Page 9 of 14 <br />