Laserfiche WebLink
No, on-site erasion during construction n'tlI be mitigated with the implementation ofa City <br /> approved TESC plan including elements such as installation ofsiltfencing, wheel wash,and <br /> stabili.ed construction entrance'. <br /> g. About what percent of the site will be covered with impervious surfaces after project <br /> construction (for example,asphalt or buildings)? <br /> 23.456 s•f of impervious ca ca 55.801.c f site area 42"n iinpen•ious <br /> h. Proposed measures to reduce or control erosion,or other impacts to the earth, if any: <br /> !luring construction, standard erosion control methods rill he implemented See item f above. <br /> 2. Air <br /> a. What types of emissions to the air would result from the proposal during construction, <br /> operation, and maintenance when the project is completed? If any, generally describe and <br /> give approximate quantities if known. <br /> Emissions from standard construction equipment and vehicles. JPlien the project is complete, vehicles trips <br /> to the building will produce greenhouse gases. Unlihc a standard multi family housing development, we <br /> anticipate very few residents will have their own vehicles, as this is rely low-income!musing awl all of the <br /> residents tall be recently homeless. After construction the majority of vehicle traffic Will he staff entering <br /> and existing to n'ork their shifts.. <br /> b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, <br /> generally describe. <br /> Notts biotin. <br /> c. Proposed measures to reduce or control emissions or other impacts to air, if any: <br /> 11'e have limited the lnuuhcr of parking spaces 01 on-site)to be provided. Vet _fen•residents still have <br /> vehicles. Covered parking for 40 bicycles is also being provided to help reduce the meed for vehicular <br /> travel. A nest,sidewalk on the north side of Berkshire Drive to connect the project property to Evergreen <br /> Way, This will pro ride the residents and the neighborhood safe access to the nearby transit.stops on <br /> Evergreen Way. Bicyclists can use the nearby transit on Emigre(tl lPayr to access several City of Everett <br /> bike routes and the Interurban recreation hike trail is less than i_mile front the the. (sec City of Everett <br /> Bicycle Map). <br /> 3. Water <br /> a. Surface Water: <br /> 1) Is there any surface water body on or in the immediate vicinity of the site(including <br /> year-round and seasonal streams, saltwater, lakes, ponds,wetlands)? If yes, describe <br /> type and provide names. If appropriate, state what stream or river it flows into. <br /> There is no.m1:filet slater body on or in the immediate vicinity of the site. Resen'oir Number <br /> Three is located within close protiniity to the site. <br /> 2)Will the project require any work over, in, or adjacent to(within 200 feet)the described <br /> waters? If yes, please describe and attach available plans. <br /> SEPA Environmental checklist(WAG 197-11.860) July 2016 Page 4 of 16 <br />