My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6107 BERKSHIRE DR SEPA 016 - 041 Geotech Report 2025-04-14
>
Address Records
>
BERKSHIRE DR
>
6107
>
SEPA 016 - 041
>
Geotech Report
>
6107 BERKSHIRE DR SEPA 016 - 041 Geotech Report 2025-04-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 7:47:38 AM
Creation date
4/3/2025 2:55:23 PM
Metadata
Fields
Template:
Address Document
Street Name
BERKSHIRE DR
Street Number
6107
Tenant Name
SEPA 016 - 041
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Catholic Housing Services JN 16298 <br /> November 1, 2016 Page 9 <br /> essentially destroying the purpose of the vapor barrier/retarder. Therefore, if there is a potential <br /> that the protection/blotter material will become wet before the slab is installed, ACI now <br /> recommends that no protection/blotter material be used. However, ACI then recommends that, <br /> because there is a potential for slab curl due to the loss of the blotter material, joint spacing in the <br /> slab be reduced, a low shrinkage concrete mixture be used, and "other measures" (steel <br /> reinforcing, etc.) be used. ASTM E-1643-98 "Standard Practice for Installation of Water Vapor <br /> Retarders Used in Contact with Earth or Granular Fill Under Concrete Slabs" generally agrees with <br /> the recent ACI literature. <br /> We recommend that the contractor, the project materials engineer, and the owner discuss these <br /> issues and review recent ACI literature and ASTM E-1643 for installation guidelines and guidance <br /> on the use of the protection/blotter material. <br /> The General, Permanent Foundation and Retaining Walls, and Drainage Considerations <br /> sections should be reviewed for additional recommendations related to the control of groundwater <br /> and excess water vapor for the anticipated construction. <br /> EXCAVATIONS AND SLOPES <br /> No excavated slopes are anticipated other than for utility trenches. Excavation slopes should not <br /> exceed the limits specified in local, state, and national government safety regulations. Temporary <br /> cuts to a depth of about 4 feet may be attempted vertically in unsaturated soil, if there are no <br /> indications of slope instability. However, vertical cuts should not be made near property <br /> boundaries, or existing utilities and structures. Based upon Washington Administrative Code <br /> (WAC) 296, Part N, the soil at the subject site would generally be classified as Type B. Therefore, <br /> temporary cut slopes greater than 4 feet in height should not be excavated at an inclination steeper <br /> than 1:1 (Horizontal:Vertical), extending continuously between the top and the bottom of a cut. <br /> The above-recommended temporary slope inclination is based on the conditions exposed in our <br /> explorations, and on what has been successful at other sites with similar soil conditions. It is <br /> possible that variations in soil and groundwater conditions will require modifications to the <br /> inclination at which temporary slopes can stand. Temporary cuts are those that will remain <br /> unsupported for a relatively short duration to allow for the construction of foundations, retaining <br /> walls, or utilities. Temporary cut slopes should be protected with plastic sheeting during wet <br /> weather. It is also important that surface runoff be directed away from the top of temporary slope <br /> cuts. Cut slopes should also be backfilled or retained as soon as possible to reduce the potential <br /> for instability. Please note that loose soil can cave suddenly and without warning. Excavation, <br /> foundation, and utility contractors should be made especially aware of this potential danger. These <br /> recommendations may need to be modified if the area near the potential cuts has been disturbed in <br /> the past by utility installation, or if settlement-sensitive utilities are located nearby. <br /> Water should not be allowed to flow uncontrolled over the top of any temporary or permanent <br /> slope. All permanently exposed slopes should be seeded with an appropriate species of vegetation <br /> to reduce erosion and improve the stability of the surficial layer of soil. <br /> Any disturbance to the existing slope outside of the building limits may reduce the stability of the <br /> western slope. Soil from the excavation should not be placed on the slope. <br /> GEOTECH CONSULTANTS, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.