Laserfiche WebLink
other <br /> b. Describe the utilities that are proposed for the project, the utility providing the service, <br /> and the general construction activities on the site or in the immediate vicinity which might <br /> be needed. (help] <br /> The completed project will be served by public water and sewer (City of Everett), natural gas <br /> (PSE), electricity (Snohomish PUD), and communication facilities (phone and cable TV) based <br /> on availability in the area. <br /> C. Signature Jhelpl <br /> The above answers are true and complete to the best of my knowledge. I understand that the <br /> lead agency is relying on them to make its decision. <br /> Signature: . <br /> Name of signee C.hos,4o4/,- g ,t/(,/,, <br /> Position andA�ency/Organization tiv?c," fla. y--, )Z,e Z/t f/iw 6 t*p <br /> Date Submitted: /Z/f//' <br /> D. supplemental sheet for nonproject actions [help' <br /> (IT IS NOT NECESSARY to use this sheet for project actions) <br /> Because these questions are very general, it may be helpful to read them in conjunction <br /> with the list of the elements of the environment. <br /> When answering these questions, be aware of the extent the proposal, or the types of <br /> activities likely to result from the proposal, would affect the item at a greater intensity or <br /> at a faster rate than if the proposal were not implemented. Respond briefly and in <br /> general terms. <br /> 1. How would the proposal be likely to increase discharge to water; emissions to air; pro- <br /> duction, storage, or release of toxic or hazardous substances; or production of noise? <br /> Proposed measures to avoid or reduce such increases are: <br /> 2. How would the proposal be likely to affect plants, animals, fish, or marine life? <br /> SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 13 of 14 <br />