My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9530 HOLLY DR 2025-08-05
>
Address Records
>
HOLLY DR
>
9530
>
9530 HOLLY DR 2025-08-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2025 10:55:19 AM
Creation date
4/4/2025 9:21:10 AM
Metadata
Fields
Template:
Address Document
Street Name
HOLLY DR
Street Number
9530
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Two -Hole Strap - designed to support CPVC piping systems when attached to <br />a flat, horizontal surface with the screw -type fasteners in the vertical position. <br />In addition, the two -hole strap is designed to support CPVC piping systems <br />when attached to a flat, vertical surface with one mounting tab in the vertical <br />position and the screw -type fasteners in the horizontal position. The two -hole <br />strap can be used as a piping system guide when the system lies on top of a <br />beam, and the beam supports the system I s weight. <br />Two -Hole 90' Side Mount Strap - designed to support CPVC piping systems <br />when attached to a horizontal beam with the screw -type fasteners in the <br />horizontal position and the pipe hanging below the beam. The fastener's <br />mounting edges are designed to allow the screws to be installed horizontally. <br />This is a benefit when overhead clearance is limited, In addition, the 900 side <br />mount strap can be used in a restrainer fashion when it is attached to the top <br />of a beam, and the system lies on top of the beam. <br />Risers must be supported by pipe clamps or by hangers located on the <br />horizontal connection close to the riser. Only Listed hangers and clamps <br />can be used, Vertical lines must be supported at intervals to avoid placing <br />excessive load on a fitting at the lower end. This can be done by using riser <br />clamps or double -bolt pipe clamps listed for this service. <br />Kqnpers 2ni. sunnorts must not romDress -distort cut, or abrade th <br />Maintain vertical piping in straight alignment with supports at each floor level or <br />10-foot intervals, whichever is less. CPVC risers in vertical shafts or buildings <br />with ceilings over 25 feet must be aligned straight and supported at each floor <br />level or 1 0-foot intervals, whichever is less. <br />10 @ 2010 SpearsO Manufacturing Company Page 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.