Laserfiche WebLink
PUBLIC WORKS PERMIT <br />City of Everett Permit Services <br />E V E R E T T 3200EveCedar <br />rett, WA 98201 Floor <br />WAS H I N GTO N everettwa.gov/permits <br />Perm itServices(@eve rettwa.eov <br />OWNER NAME AND ADDRESS: <br />BUSTARD CUSTOM CONSTRUCTION INC <br />13016 107TH ST NE <br />LAKE STEVENS, WA 98258 <br />PHONE: <br />Date Applied: 3/30/2022 <br />Public Works Permit #: PW2203-033 <br />Associated Bldg Permit #: #: <br />Planning Reference #: <br />Public Works Fee: $5583.67 <br />Schedule Inspections at: onlinepermits.everettwa.gov <br />APPLICANT NAME AND ADDRESS: <br />PAUL BUSTARD <br />PHONE: 4258766551 <br />SITE ADDRESS: 9530 HOLLY DR TAX PARCEL ID #: 00378700200600 <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />DESCRIPTION: SITE WORK FOR PROPOSED SHORT SUBDIVISION <br />NOTES: SITE WORK FOR PROPOSED SHORT SUBDIVISION <br />PERMIT CONDITIONS: <br />1. All inspections shall be scheduled online at https://onlinepermits.everettwa.gov. Available inspection dates are shown in the dropdown <br />menu. <br />2. All work shall be performed in accordance with the permit and current City of Everett 'Design and Construction Standards and Specifications <br />for Development'. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />4. Site Civil Work to be done per plans, SWPPP, and drainage report approved by the City of Everett Public Works Department dated <br />10/07/2022. Approved plans must remain on job -site at all times. <br />5. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at onlinepermits.everettwa.gov to formally <br />request all required inspections. A handout is provided at permit issuance with instructions on how to request an inspection online. <br />6. Any damage to City improvements (sidewalk, curb, roadway, etc.) shall be replaced per City Standards and/or as directed by the City PW <br />Inspector. <br />7. City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense. This work to be <br />under a separate Utility Permit to be purchased at the Permit Services Counter per a cost estimate by the Water Department. Work shall be <br />scheduled 3-4 weeks in advance. <br />8. As-builts of storm, sanitary sewer, and water systems will be required to be submitted to the PW Inspector per City Design and <br />Construction Standards and Specifications for Development prior to final approval/close out of the permit. <br />9. On -site water main will be staked within an easement to the City. The easement documentation will be submitted to the City prior to <br />issuance of permits and must be recorded by the project team with a copy of the recorded document submitted to the City prior to final <br />approval/close out of the permit. <br />10. A 1-year Warranty Bond in the amount of 10% of the construction costs for all public improvements shall be submitted to the City prior <br />to final approval/close out of the permit. <br />11. A 2-year Warranty Bond in the amount of 10% of the construction costs for all Stormwater Infrastructure shall be submitted to the City <br />prior to final approval/close out of the permit. <br />12. A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector. To schedule a planning <br />inspection, contact Planning@everettwa.gov and request an inspection with the permit number, site address, and inspection type listed. <br />Please allow up to one week for the inspection to be scheduled. <br />13. Prior to any interruption to the public right-of-way (roadways, parking lanes, or sidewalks) a Traffic Street Use permit shall be obtained <br />from the City's Traffic Engineering Division. This permit can be applied for online at onlinepermits.everettwa.gov and requires a traffic <br />control plan to be submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br />14. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by <br />selecting PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests when all items have been completed for <br />this permit. <br />15. The final plat shall have a prominent note for each lot identifying the following: <br />• The maximum impervious area per lot. <br />• The maximum impervious area for the private road. The bioretention cell for the private road shall be designed per <br />approved plans. <br />Page 1 of 2 <br />APPLICANT/JOB SITE COPY ___ADDRESS FILE __TREASURER <br />