My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
400 RIVERSIDE RD SEPA 016 - 039 - RIVERSIDE BUSINESS PARK Geotech Report 2025-04-14
>
Address Records
>
RIVERSIDE RD
>
400
>
SEPA 016 - 039 - RIVERSIDE BUSINESS PARK
>
Geotech Report
>
400 RIVERSIDE RD SEPA 016 - 039 - RIVERSIDE BUSINESS PARK Geotech Report 2025-04-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 7:58:17 AM
Creation date
4/4/2025 11:43:01 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
400
Tenant Name
SEPA 016 - 039 - RIVERSIDE BUSINESS PARK
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 8,2016 <br /> Project No. T-7388-1 <br /> 5.7 Drainage <br /> Surface <br /> Final exterior grades should promote free and positive drainage away from the building areas. We recommend <br /> providing a gradient of at least three percent for a minimum distance of ten feet from the building perimeter, <br /> except in paved locations. In paved locations, a minimum gradient of two percent should be provided, unless <br /> provisions are included for collection and disposal of surface water adjacent to the structure. <br /> ' Subsurface <br /> In our opinion, with the area immediately adjacent to the structure paved, and positive surface drainage <br /> maintained, perimeter foundation drains would not be necessary. If the grade is not positively drained away from <br /> ' the structure or is landscaped, perimeter foundation drains should be installed. <br /> To guard against hydrostatic pressure development, retaining wall drainage must be installed. We recommend <br /> ' that wall drainage consist of a minimum 12-inch thick layer of washed or pea gravel placed adjacent to the wall. <br /> Alternatively, a composite drainage panel such as Mirafi GI00N or equal can be used. A four-inch diameter <br /> perforated pipe should be placed on a bed of gravel along the base of the wall footing and directed to a suitable <br /> outlet. <br /> 5.8 Utilities <br /> Utility pipes should be bedded and backfilled in accordance with American Public Works Association (APWA), <br /> ' or City of Everett specifications. As a minimum, trench backfill should be placed and compacted as structural <br /> fill, as described in Section 5.2 of this report. Most inorganic native and existing fill soils excavated on the site <br /> should be suitable for use as backfill material during dry weather conditions. However, if utility construction <br /> takes place during the wet winter months, it may be necessary to import suitable wet weather fill for utility trench <br /> backfil ling. <br /> ' Depending on final utility grades, the utility contractor should also be prepared for encountering unstable soft <br /> peat soils below the pipe invert elevations. If not removed from below the pipe and replaced with crushed rock <br /> ' or additional bedding material, pipe deflections will occur as a result of the soil yielding and compressing in <br /> response to loading imposed by the trench backfill. <br /> Page No. 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.