Laserfiche WebLink
I <br /> I <br /> Geotechnical Report <br /> IRiverside Business Park, Lots 2 and 4 <br /> Riverside Road <br /> Everett, Washington <br /> I <br /> 1.0 PROJECT DESCRIPTION <br /> IThe project consists of developing Lots 2 and 4 comprising approximately 11 acres of land at the Riverside <br /> Business Park in Everett, Washington. Sheet GP-01, dated November 16, 2016 prepared by The Blueline Group <br /> I indicates development will include construction of two industrial buildings with associated infrastructure <br /> improvements. Buildings A and B will have footprint areas of 98,000 and 110,700 square feet, respectively. <br /> Each of the buildings will have their floors constructed at Elev. 20.25. Loading docks are planned at the south <br /> I <br /> side of Building A and the east side of Building B. <br /> We expect the building will be constructed using precast concrete tilt up wall panels with interior isolated <br /> I columns supporting the roof framing. We anticipate structural loading will be light, with columns carrying 100 <br /> to 150 kips and continuous bearing walls carrying 4 to 6 kips per lineal foot. Product loading on the floor slab is <br /> not expected to exceed 350 pounds per square foot. <br /> IThe recommendations contained in the following sections of this report are based on the above design features. <br /> We should review any changes in the geotechnical aspects of the design plans as they are developed to verify that <br /> Iour recommendations are valid for the proposed construction and to amend or modify our report, as necessary. <br /> I2.0 SCOPE OF WORK <br /> Our scope of work was completed in general accordance with our authorized proposal dated October 25, 2016. <br /> On November 21 and 22, 2016, six Cone Penetration Tests (CPTs) were advanced at the site to depths of 60 and <br /> I <br /> 60.5 feet. Using the information obtained from our subsurface exploration, we performed analyses to develop <br /> geotechnical engineering recommendations for project design and construction. <br /> ISpecifically,this report addresses the following: <br /> • Soil and groundwater conditions <br /> • Seismic <br /> • Site preparation and grading including recommendations for building preload or surcharge to mitigate <br /> floor and foundation settlement. <br /> • Foundations <br /> I • Floor slabs <br /> • Lateral earth pressures for wall design <br /> I • Subsurface drainage <br /> • Utilities <br /> I • Pavements <br />