My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3710 TULALIP AVE SEPA 016 - 015 Land Use Decision Documents 2025-05-12
>
Address Records
>
TULALIP AVE
>
3710
>
SEPA 016 - 015
>
Land Use Decision Documents
>
3710 TULALIP AVE SEPA 016 - 015 Land Use Decision Documents 2025-05-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2025 1:27:49 PM
Creation date
4/4/2025 2:13:57 PM
Metadata
Fields
Template:
Address Document
Street Name
TULALIP AVE
Street Number
3710
Tenant Name
SEPA 016 - 015
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. How many parking spaces would the completed project have? How many would the project <br /> eliminate? Does not apply <br /> d. Will the proposal require any new roads or streets, or improvements to existing roads or <br /> streets, not including driveways? If so,generally describe(indicate whether public or private). No <br /> e.. Will the project use(or occur in the immediate vicinity of)water, rail,or air transportation? If <br /> so,generally describe.Yes,the project is adjacent to BNSF railroad switching yard and some <br /> construction activities will be within BNSF property(as permitted by easement) however the <br /> project does not interfere with BNSF operations. <br /> f. How many vehicular trips per day would be generated by the completed project? If known, <br /> indicate when peak volumes would occur. None <br /> g. Proposed measures to reduce or control transportation impacts, if any:City will coordinate <br /> with local businesses to mitigate the temporary impacts associated with parking and vehicle <br /> access. <br /> 15. Public Services <br /> a. Would the project result in an increased need for public services(for example:fire protection, <br /> police protection, health care,schools,other)? If so,generally describe,No <br /> b. Proposed measures to reduce or control direct impacts on public services, if any: None <br /> 16. Utilities <br /> a. Circle utilities currently available at the site: electricity, natural gas,water, refuse service, <br /> [telephone,sanitary sewer,septic system, other. <br /> b. Describe the utilities that are proposed for the project,the utility providing the service, and <br /> the general construction activities on the site or in the immediate vicinity which might be needed. <br /> None needed <br /> C. SIGNATURE <br /> The above answers are true and complete to the best of my knowledge. I understand that the lead <br /> agency is relying on them to make its decision. <br /> 2.930 Wetmore Avenue,Suite 8-A Everett,WA 98201 0 425.257.8731 0 F 425.257.8742 0 www.everettwa.org 0 Updated 2009 <br /> �! /4) <br />
The URL can be used to link to this page
Your browser does not support the video tag.