My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3710 TULALIP AVE SEPA 016 - 015 Land Use Decision Documents 2025-05-12
>
Address Records
>
TULALIP AVE
>
3710
>
SEPA 016 - 015
>
Land Use Decision Documents
>
3710 TULALIP AVE SEPA 016 - 015 Land Use Decision Documents 2025-05-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2025 1:27:49 PM
Creation date
4/4/2025 2:13:57 PM
Metadata
Fields
Template:
Address Document
Street Name
TULALIP AVE
Street Number
3710
Tenant Name
SEPA 016 - 015
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> B. ENVIRONMENTAL ELEMENTS <br /> c. What general types of soils are found on the site (for example, clay, sand,gravel, peat, <br /> muck)? If you know the classification of agricultural soils,specify them and note any agricultural land of <br /> long-term commercial significance and whether the proposal results in removing any of these soils. <br /> Silty-sand fill and topsoil near the surface,dense clay at depth. <br /> e. Describe the purpose,type,total area, and approximate quantities and total affected area of any <br /> filling, excavation, and grading proposed. Indicate source of fill. <br /> Approximately 5,500 cubic yards excavation and backfill for pipes and manholes <br /> 2.Air <br /> a. What types of emissions to the air would result from the proposal during construction, <br /> operation, and maintenance when the project is completed? If any,generally describe and give <br /> approximate quantities if known. <br /> There will be no increase in emissions by the completed project. Some occasional dust,diesel exhaust <br /> and sewer odor emissions may occur during construction. <br /> 3. Water <br /> b. Ground Water: <br /> 1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so,give a <br /> general description of the well, proposed uses and approximate quantities withdrawn from the well. <br /> Will water be discharged to groundwater?Give general description, purpose, and approximate <br /> quantities if known. <br /> No. <br /> c. Water runoff(including stormwater): <br /> 3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so, <br /> describe <br /> No. <br /> //S <br />
The URL can be used to link to this page
Your browser does not support the video tag.