Laserfiche WebLink
e. Describe the purpose,type,and approximate quantities of any filling or grading proposed. <br /> Indicate source of fill. <br /> The estimated quantity of concrete and soil to be removed and replaced is 978 c.y.for Phase I; <br /> Phase 2 will include the remainder of the hardstand relocations and will remove and replace up to <br /> 3,168 c.y. of concrete and soil. Finished grades would be unchanged. <br /> f. Could erosion occur as a result of clearing,construction,or use? If so,generally describe. <br /> 'There is no potential for erosion as the project vicinity is currently paved. <br /> g. About what percent of the site will be covered with impervious surfaces after project <br /> construction(for example,asphalt or buildings)? <br /> The area is 100%impervious today and will remain as such at the completion of the project. <br /> h. Proposed measures to reduce/control erosion,or other impacts to the earth,if any: <br /> No erosion control measures are proposed, other than temporary measures implemented during <br /> construction. <br /> 2. Air <br /> a. What types of emissions to the air would result from the proposal (i.e.,dust,automobile, <br /> odors,industrial wood smoke)during construction and when the project is completed? If <br /> any,generally describe and give approximate quantities if known. <br /> The soil removal may generate a certain amount of dust, depending upon weather conditions. All <br /> reasonable means will be used to control dust generated during construction such as wetting dust <br /> sources of exposed soil, washing truck tires before entering public roadways, etc. <br /> b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, <br /> generally describe. <br /> No off-site emissions or odors will affect this project. <br /> c. Proposed measures to reduce or control emissions or other impacts to air,if any: <br /> During construction, the contractor will be required to adhere to Best Management Practices to <br /> minimize dust and Foreign Object Debris(FOD)as noted above. Long term, removal of the <br /> concrete and soil will have no impact to overall air emissions. <br /> 3. Water <br /> a. Surface: <br /> 1) Is there any surface water body on or in the immediate vicinity of the site(including year- <br /> round and seasonal streams,saltwater,lakes,ponds,wetlands)? If yes,describe type and <br /> provide names. If appropriate,state what stream or river it flows into. <br /> 4 <br />