Laserfiche WebLink
1PPL LAND USE REVIEW <br /> Project#: SEPAl6-033 <br /> 7 f; Project Planner: Teresa Weldon <br /> TO: Engineering/Public Services Reviewers <br /> FROM: Benyam Stephanos, Development Technician <br /> DATE SENT: November 23, 2016 <br /> SUBJECT: PRELIMINARY REVIEW FOR TENTATIVE APPROVAL OF: <br /> Boeing Flightline Stall Modifications <br /> PROJECT #: SEPA16-033 <br /> PROPOSAL: : The project consists of infrastructure modifications to existing flightline stalls, including <br /> relocating power stands, compressed air and potable water connections. The estimated quantity of <br /> concrete and soil removed will be 978 CY for Phase I and 3,168 CY for Phase II. See the Environmental <br /> Checklist for detailed information and project description. <br /> LOCATION: 3003 W Casino Rd <br /> APPLICANT: Boeing, Dave Tyler <br /> Hyperlink to Plans: <br /> https://ftp.everettwa.qov/?ShareToken=CE4445462851 F79505AD24CA8E09D21603B0A36B <br /> • Please respond to the Development Technician by the date below,even if your response is "No Comment". <br /> • If further site information is necessary, please contact the Development Technician noted below. <br /> • Your comments are to be made on this sheet or referenced on a separate attached sheet. Any comments written on the <br /> proposal itself will not be recognized. <br /> DUE: Please return your comments to Benyam Stephanos by December 2, 2016. <br /> COMMENTS: <br /> No Comment at this time. <br /> Distribution List: (Select the check box for your division) <br /> ▪Development Technician Utilities <br /> ❑Traffic ❑X Sewer <br /> ❑Surface Water ❑Water <br /> ❑Real Property ❑Cross Connection Evaluation <br /> ❑Building Official ❑Industrial Pretreatment <br /> ❑Permit Services Manager ❑Street <br /> ❑Transit and Transportation <br /> Revised 3/23/2016 <br />