Laserfiche WebLink
No measures are proposed other than Port of Everett improvements to 8th <br />Street as noted earlier. <br />15. Public Services <br />a. Would the project result in an increased need for public services (for example: fire protection, <br />police protection, public transit, health care, schools, other)? If so, generally describe. <br />There may be a slightly increased need for police and fire services, but those <br />should be minimal because the buildings will be new with modern fire <br />protection and site security systems installed. The inherent nature of cross - <br />dock facilities is one of reduced risk in that products are not warehoused, <br />simply transferred. <br />b. Proposed measures to reduce or control direct impacts on public services, if any. <br />No measures are proposed. <br />16. Utilities <br />a. Circle utilities currently available at the site: <br />electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, <br />other <br />b. Describe the utilities that are proposed for the project, the utility providing the service, <br />and the general construction activities on the site or in the immediate vicinity which might <br />be needed. <br />Electricity: Snohomish County PUD, water & sewer: City of Everett, natural gas: Puget <br />Sound Energy, Solid Waste Disposal: City of Everett <br />C. Signature <br />The above answers are true and complete to the best of my knowledge. I understand that the <br />lead agency is relying on them to make its decision. <br />Digitally signed by Michael Fa <br />Signature: Michael Fa Date: 2016.0830 20:57:05 -04'00' <br />Name of signee Michael G. Fa <br />Position and Agency/Organization Project Manager / KW EVT, LLC <br />Date Submitted: August 30, 2016 <br />SEPA Environmental checklist (WAC 197.11.960) July 2016 Page 17 of 17 <br />