My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
625 RIVERSIDE RD SEPA 016 - 028 - FREIGHT HANDLING FACILITY Land Use Decision Documents 2025-04-21
>
Address Records
>
RIVERSIDE RD
>
625
>
SEPA 016 - 028 - FREIGHT HANDLING FACILITY
>
Land Use Decision Documents
>
625 RIVERSIDE RD SEPA 016 - 028 - FREIGHT HANDLING FACILITY Land Use Decision Documents 2025-04-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2025 2:34:35 PM
Creation date
4/4/2025 4:05:27 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
625
Tenant Name
SEPA 016 - 028 - FREIGHT HANDLING FACILITY
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If no official name for the wetland exists, create a unique name (such as "Wetland 1"). The name should be consistent with other project documents, such <br />as a wetland delineation report. <br />2 Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System. Provide the wetland <br />rating forms with the JARPA package. <br />3Indicate the days, months or years the wetland will be measurably impacted by the activity. Enter "permanent' if applicable. <br />a Creation (C), Re-establishment/Rehabilitation (R), Enhancement (E), Preservation (P), Mitigation Bank/In-lieu fee (B) <br />Page number(s) for similar information in the mitigation plan, if available: <br />7L For all filling activities identified in 7h, describe the source and nature of the fill material, the amount in cubic <br />yards that will be used, and how and where it will be placed into the wetland. [help] <br />7j. For all excavating activities identified in 7h, describe the excavation method, type and amount of material in <br />cubic yards you will remove, and where the material will be disposed. heI <br />Part 8—Waterbodies (other than wetlands): Impacts and Mitigation <br />In Part 8, "waterbodies" refers to non -wetland waterbodies. (See Part 7 for information related to wetlands.) [help] <br />❑ Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.) <br />8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment. <br />Lam] <br />❑ Not applicable <br />JARPA Revision 2015.1 Page 8 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.