My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
625 RIVERSIDE RD SEPA 016 - 028 - FREIGHT HANDLING FACILITY Land Use Decision Documents 2025-04-21
>
Address Records
>
RIVERSIDE RD
>
625
>
SEPA 016 - 028 - FREIGHT HANDLING FACILITY
>
Land Use Decision Documents
>
625 RIVERSIDE RD SEPA 016 - 028 - FREIGHT HANDLING FACILITY Land Use Decision Documents 2025-04-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2025 2:34:35 PM
Creation date
4/4/2025 4:05:27 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
625
Tenant Name
SEPA 016 - 028 - FREIGHT HANDLING FACILITY
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S:\MBnck\development review\2016\10-Oct\SEPA16-028 xlsx Printed.9/29/2016 2 22 PM <br /> Project Name 8th Street Crossdock Traffic Reviewer MGB <br /> Project Location 625 Riverside Rd Dev Reviewer SF <br /> Project Description 39,171 SF warehouse(phase 1),add'I 13,479 SF(phase 2) Planner JJ <br /> Received Date 9/26/2016 Due Date 10/4/2016 Review Date 9/28/2016 File# SEPA 16-028 <br /> Area Type OCBD EISW Everett pRemainder <br /> COMMENT/COVER SHEET <br /> This project is subject to Transportation Mitigation in accordance with Ordinance 3387-14(codified as EMC 18.40)and <br /> subsequent revision. Applicant is encouraged to obtain a copy of the Ordinance and determine applicable mitigation <br /> fees and/or other requirements prior to building permit application. The actual charges and requirements shall be as <br /> per the information on the approved plans at the time of building permit issuance and the ordinance in effect at that <br /> time. <br /> It is the City of Everett's estimate that Phase 1 of this project shall generate a net increase of 18 PM Peak Hour trips above <br /> existing mitigated conditions If calculated today(Sept 29,2016)this project would owe a traffic mitigation fee of$43,200 upon <br /> building permit issuance. <br /> It is the City of Everett's estimate that Phase 2 of this project shall generate a net increase of 6 PM Peak Hour trips above <br /> Phase 1 mitigated conditions If calculated today(Sept 29,2016)this project would owe a traffic mitigation fee of$14,400 upon <br /> building permit issuance. This is in addition to traffic mitigation fees paid for Phase 1 building permits. <br /> All public roadway improvements shall be completed prior to building occupancy. <br /> Improvements to public roadways may be completed by developer of this project, by the Port of Everett, or by a third party <br /> No additional Traffic comments on this project. <br /> City of Everett Staff Use Only <br />
The URL can be used to link to this page
Your browser does not support the video tag.