My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4730 COLBY AVE SEPA 016 - 027 - YMCA Traffic Report 2025-04-14
>
Address Records
>
COLBY AVE
>
4730
>
SEPA 016 - 027 - YMCA
>
Traffic Report
>
4730 COLBY AVE SEPA 016 - 027 - YMCA Traffic Report 2025-04-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 7:31:25 AM
Creation date
4/7/2025 8:59:31 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
4730
Tenant Name
SEPA 016 - 027 - YMCA
Address Document Type
Traffic Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
YMCA Recreational Community Center Traffic Impact Analysis <br /> 5. TRAFFIC VOLUMES <br /> Count data at the study intersections was collected by the independent count firm Traffic Data <br /> Gathering (TDG) and GTC staff. The existing turning movements at the study intersections are <br /> shown in Figure 3. The 2021 baseline traffic volumes were determined using the City of Everett's <br /> expected growth rates for Colby Avenue, which is an annually compounding growth rate of 2.3%. <br /> The 2021 baseline turning movements at the study intersections are shown in Figure 4. The 2021 <br /> future with development traffic volumes were calculated by adding the development's trips to the <br /> 2021 baseline traffic volumes. The 2021 future with development turning movements at the study <br /> intersection are shown in Figure 5. The traffic volume calculations are included in the attachments. <br /> 6. LEVEL OF SERVICE <br /> The analysis of the study intersections has been performed using the Sl.7ichro 9.1, Build 903 <br /> software. The level of service analysis utilizes a future year of 2021 to be consistent with the City <br /> of Everett guidelines; however, the development is anticipated to be occupied prior to 2021. The <br /> level of service at the study intersections is summarized in Table 3. <br /> Table 3: Level of Service Summary <br /> 2015 Existing 2021 Baseline 2021 Future <br /> Intersections Conditions Conditions w Development <br /> LOS Delay LOS Delay LOS Delay <br /> 1. Colby Avenue at C 19.9 sec C 22.2 sec C 24.4 sec <br /> 48'Street SE <br /> 2. Rucker Avenue at <br /> 48a Street SE A 9.5 sec A 9.6 sec B 10.1 sec <br /> All of the intersections will operate at or better than the City of Everett adopted level of service <br /> standard of LOS D. <br /> Gibson Traffic Consultants, Inc. August 2015 <br /> info@gibsontraffic.com 7 GTC #15-118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.