My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/06/01 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/06/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2016 9:55:43 AM
Creation date
6/8/2016 9:54:42 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/1/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State of Arashington Department of Ecology 1 3 Page 2 of 41 <br /> AnreementNo: WQC-2016-EverPW-00014 <br /> Project Title: Cleveland Ave.Sewer Replacement and Stormwater Separation <br /> Recipient Name: City of Everett-Public Works Department <br /> through August),80 CSO discharge events totaling 6.2 million gallons volume occurred. <br /> This project is the second phase of a two phase project to add drainage pipe and water quality treatment <br /> facilities to provide full stormwater separation from a 27 acre combined sewer area.Approximately 30 <br /> stormwater treatment units(e.g.Filterra and Contech Stonnfilter)and one bioretention swale will be installed. <br /> The project also includes 7 acres of combined sewer area,south of Everett Avenue,which will be converted to <br /> partial separation with water quality flows continuing to be directed to the RECIPIENT'S Water Pollution <br /> Control Facility for treatment.Separated and treated stormwater from the full stormwater separation area and <br /> higher stormwater flows from the partial separation area will discharge to the Snohomish River.Benefits to the <br /> Snohomish River and Puget Sound,including reductions in in fecal coliform and TSS will be achieved by <br /> reducing the number and severity of CSO events. <br /> Overall Goal: <br /> This project will help protect and restore water quality in Washington by reducing stormwater impacts from <br /> existing infrastructure and development. <br /> • <br /> 143 <br /> Version 10/30/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.