Laserfiche WebLink
c. Describe any structures on the site. <br />No structures exist on site. <br />d. Will any structures be demolished? If so, what? <br />No. <br />e. What is the current zoning classification of the site? <br />M-1 Office and Industrial Park. <br />f. What is the current comprehensive plan designation of the site? <br />5.4 Office and Industrial Park. <br />g. If applicable, what is the current shoreline master program designation of the site? <br />Not applicable. <br />h. Has any part of the site been classified as a critical area by the city or county? If so, specify. <br />Yes. Four wetlands are located on site, two Category 11 and two Category Ill. <br />Wetlands A, B and C are located in the southeast corner of the site and Wetland <br />D is located in the central portion of the site. <br />i. Approximately how many people would reside or work in the completed project? <br />It is anticipated that approximately 75 employees per 100,000 square feet of <br />combined office and manufacturing space work work in the completed project. <br />Therefore, there would be approximately 375 employees in the fully completed <br />project. <br />j. Approximately how many people would the completed project displace? <br />None. <br />k. Proposed measures to avoid or reduce displacement impacts, if any: <br />None. <br />L. Proposed measures to ensure the proposal is compatible with existing and projected land <br />uses and plans, if any: <br />SEPA Environmental checklist (WAC 197-11-960) May 2014 Page 11 of 16 <br />