My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5900 36TH AVE W SEPA 016 - 035 - SOUNDVIEW BUSINESS CAMPUS - VERITAS Land Use Decision Documents 2025-04-21
>
Address Records
>
36TH AVE W
>
5900
>
SEPA 016 - 035 - SOUNDVIEW BUSINESS CAMPUS - VERITAS
>
Land Use Decision Documents
>
5900 36TH AVE W SEPA 016 - 035 - SOUNDVIEW BUSINESS CAMPUS - VERITAS Land Use Decision Documents 2025-04-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2025 2:52:22 PM
Creation date
4/7/2025 1:10:08 PM
Metadata
Fields
Template:
Address Document
Street Name
36TH AVE W
Street Number
5900
Tenant Name
SEPA 016 - 035 - SOUNDVIEW BUSINESS CAMPUS - VERITAS
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: <br />A stormwater pollution prevention plan (SWPPP) will be prepared in accordance with the <br />Washington State Dept. of Ecology's NPDES permit requirements. Approved erosion <br />mitigation measures will be implemented prior to and during construction. The erosion <br />control plan will include filter fabric fencing, a construction entrance, temporary swales and <br />sediment ponds, and the employment of Best Management Practices during construction. <br />The NPDES permit will be secured through the Washington State Dept. of Ecology prior to <br />construction. <br />2. Air <br />a. What types of emissions to the air would result from the proposal during construction, - <br />operation, and maintenance when the project is completed? If any, generally describe and <br />give approximate quantities if known. <br />Construction vehicles and equipment will result in increased emissions and dust into the air. <br />After project completion, emissions to the air will be limited to the vehicle exhaust <br />generated by employees and customers of the retail development. <br />b. Are there any off -site sources of emissions or odor that may affect your proposal? If so, <br />generally describe. <br />No. <br />c. Proposed measures to reduce or control emissions or other impacts to air, if any: <br />Site will be sprinkled with water during dry construction months as necessary to control <br />dust. Construction vehicles are typically equipped with factory -installed mufflers and spark <br />arresters that will control excessive emissions. <br />3. Water <br />a. Surface Water: <br />1) Is there any surface water body on or in the immediate vicinity of the site (including <br />year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe <br />type and provide names. If appropriate, state what stream or river it flows into. <br />There are four small wetlands on site, two Category I/ and two Category Ill. Wetlands A, B <br />and C are located in the southeast corner of the site and Wetland D is located in the central <br />portion of the site. <br />Two streams are located near the site. Japanese Gulch Creek, a Type F stream, is located <br />off -site to the west. Edgewater Creek, a Type FIN stream, is located off -site to the <br />northwest. Both of these streams flow to Puget Sound, which is located approximately <br />2,000 feet north of the site. <br />SEPA Environmental checklist (WAC 197-11-960) May 2014 Page 5 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.