Laserfiche WebLink
info@b2engineers.com <br /> — -- II II II II II II 425-318-7047(0) <br /> _— �/ / "� II II II II II I II II II II II II 425-318-0031 (C) <br /> �� � II II II II II II II II II II II II II II II II II II II II II II II <br /> II II _II___II I II II II II II <br /> 3/4"APA PLYWOOD FLOOR <br /> / - --- II II II II II II II II II II II I SHEATHING WITH 10d NAILS AT II II II II II <br /> 11 II 11 11 11 II 11 11 _II I II 6"EDGE&BLOCKING NAILING II II II II II <br /> _ AND 10d AT 12"FIELD NAILING' <br /> _, -_ _ II II II II II II II II II II II II II II II II <br /> --- A s II II II II II II A II II II IIB II II II II <br /> S 1 _ S-1 F_zFIF111 ,11111 <br /> _ IS-1 II II II <br /> 11 IItl ,REINFORCE EXISTING 6X8 <br /> ! BEAM WITH 6X8 MEMBERII II I II II II II II II II II IIFROM BELOW II II II II II <br /> II II II <br /> T6X.DF Jtt2(PS )B DF#2(P-4) X6 OF#2(P-1) 6X6 DF (P-2)-6X8 DF#2(P-3) ! NEW(3)2X10BEAM EXIST.IIn F4 F.1 I III `'fi e Bq <br /> Q,e� was ryS� <br /> I II II II II II EXISTING BEAM TO BE REMOVED;II I II poi <br /> r SHORING AS R S TO T CONTRACTOR SHALL PROVIDE�11TINGS <br /> REMOVED;CONTRACTOR I TEMPORARY SHORING AS REQ D <br /> E TEMPORARY I PRIOR TO DEMOLITION WORKS <br /> EQ'D PRIOR n II <br /> IMPORTANT NOTE: TO POST REMOVAL IiiII II II <br /> ALL FOOTINGS SHALL BEAR ON SUITABLE SOIL SUCH AS I SPLICE EXISTING FLOOR JOISTS �S ORALS <br /> MIN.OF MEDIUM DENSE NATIVE SOIL OR COMPACTED Q 16"O.C.WITH NEW MEMBERS I S/ONAL tiN <br /> STRUCTURAL FILL(NO SOFT OR ORGANIC MATERIALS) - I OPTION 1:(2 #2 <br /> I II II II II II II C9e29FR <br /> I PROVIDE LUS HANGER <br /> II I II II II II II TO EACH JOISTALONG II II <br /> RIM BOARD HEADER <br /> II II <br /> 2X10 RIM BOARD <br /> �_--- --I. AS A HEADER <br /> MATT HECK <br /> n B4SEMEONT 7 M4" 0.. MCDOUGALL <br /> AVE EVERETT <br /> ISOLATEDFOOTING SCHEDULE IMPORTANT NOTES FOR CONTRACTOR: <br /> 1.ID TYPE WIDTH LENGTH THICKNESS COUNT REINFORCEMENT NECCE PROVIDE PRIOR <br /> SHORING AS <br /> NECCESSARY PRIOR TO DEMOLITION WORKS <br /> F-1 RECTANGULAR 38" 38" 10" 1 4-#4E.W. 2.NOTIFYENGINEEROFANYDISCREPANCY <br /> IN COMPARISON WITH STRUCTURAL <br /> F-2 RECTANGULAR 33" 33" 10" 3 4-#4 E.W. DOCUMENTS AND FIELD CONDITIONS 2105 MCDOUGALL AVE, <br /> F-4 RECTANGULAR 36" 36" 1 10" 1 4-#4 E.W. o CONTRACTOR NOTES EVERETT,WA 98201 <br /> 1/4"=1'-0" <br /> IMPORTANT NOTES ON DRAWING REVIEW,FIELD VERIFICATION,TEMPORARY SHORING <br /> REINFORCE EXISTING JOISTS AND WATERPROOFING: <br /> WITH NEW MEMBERS PER PLAN, <br /> EACH MEMBER SHALL BE 1.CONTRACTOR MUST REVIEW STRUCTURAL DRAWINGS PRIOR TO CONSTRUCTION& <br /> PROVIDE BLOCKING, FASTENED TO ADJACENT WITH NOTIFY DESIGN TEAM/OWNER OF ANY DISCREPANCY IN COMPARISON WITH <br /> - IF MISSING (2)10d COMMON NAILS @ 12'.O.C. ARCHITECTURAL DOCUMENTS OR FIELD CONDITIONS. <br /> - -- 2.IN REMODELIRETROFIT PROJECTS,CONTRACTOR MUST FIELD VERIFY&NOTIFY <br /> DESIGN TEAM/OWNER OF EXISTING MECHANICAL,PLUMBING,AND ELECTRICAL LINES <br /> EXISTING BEAM THAT MAY INTERFERE WITH STRUCTURAL WORK PRIOR TO CONSTRUCTION. <br /> EXISTING BEAM EXISTING BEAM AND POST TO BE STRUCTURAL DRAWINGS MAY NOT REFLECT ALL EXISTING FRAMING CONDITIONS DUE <br /> PROVIDE AC POST REMOVED;CONTRACTOR SHALL TO LIMITED AVAILABLE INFORMATION. <br /> CAP,BOTH SIDES(OR NEW BEAM BELOW PER PLAN, PROVIDE TEMPORARY SHORING AS 3.CONTRACTOR SOLELY RESPONSIBLE IN PROVIDING PROPER TEMPORARY SHORING <br /> SIMILAR ALTERNATIVE) SHALL BE SCREWED TO REQ'D PRIOR TO DEMOLITION WORKS PRIOR TO REMOVING ANY STRUCTURAL ELEMENTS. <br /> EXISTING BEAM WITH 4.ENGINEER IS NOT RESPONSIBLE FOR WATERPROOFING SYSTEM OR DETAILS. <br /> SDWS221000 SCREW @ 6"O.C. CONTRACTORIOWNER SHALL CONSULT WITH QUALIFIED PROFESSIONALS AS REQUIRED <br /> PROVIDE ABU POST BASE W/ IMPORTANT NOTES ON FOUNDATION AND FRAMING: <br /> NEW POST 5/8"X 5 STRONG BOLT 2 PROVIDE ABU POST BASE W/ 1.ALL FOOTINGS SHALL BEAR ON SUITABLE SOIL SUCH AS AT MIN.OF MEDIUM DENSE <br /> PER PLAN - (OR SIMILAR <br /> R ALTERNATIVE) PROVIDE <br /> POST PER PLAN WITH 5/8"X 5112"STRONG BOLT 2 NATIVE SOIL OR COMPACTED STRUCTURAL FILL TO AT LEAST 95%OF MAX.DRY <br /> FOOTING REINFORCEMENT ADDITIONAL2X6 MEMBER,NAILED (OR SIMIaRALTERNATIVE) DENSITY BASED ON ASTM D1557.GEOTECHNICAL ENGINEER MAY INSPECT TO VERIFY DRAWING INFO <br /> PER SCHEDULE TO POST W/10d NAILS @ 6"O.C. I - THAT THE FOUNDATION WILL BEAR ON SUITABLE MATERIAL. <br /> FOOTING REINFORCEMENT - 2.FOR FRAMING LUMBER TYPES AND GRADES,AND CONCRETE MIX REQUIREMENTS <br /> PER SCHEDULE PLEASE SEE S-0 ISSUE DATE 05-29-24 <br /> O "j a_ •; _ ,,, 3.FOR PLYWOOD/OSB SHEARWALL SCHEDULE&HOLDOWN ANCHOR SIZE AND <br /> _ _ _ _ _ _ EMBEDMENT,PLEASE SEE S-XX(WA) <br /> HIDTH&LENGTH ISOIL PER NOTES PREPARATIONS _ •— — <—III—III— — '• 5.PROVIDE 24.FOR Q2X6 0RD(3)2X4ER �STUD PONG STS AT EACHIL AND END OF BEAMS,DER SIZE,SEE NLESS NOTED ISSUED FOR PERMIT <br /> _— .—{�- <br /> -III—PER SCHEDULE—I I— -III—III— `—III—IPER OILNOTE5 ONTS-NRE <br /> S III—III— OTHERWISE ON PLAN <br /> III III .III III III—III—III—III—I 6.SLAB ON GRADE SHALL BE MIN.4"THICK WITH#3 AT 18"EACH WAY(AT MID_ PROJECT PROJECT NO. 24103 <br /> Section A n Section B ON 6"COMPACTED CRUSHED ROCK.SAWCUT JOINT(1"DEEP)AT 15 FT MAX.SPACING <br /> 1/2"=1'-O" �+ 'I/2"=1'-O'� EACH WAY SHALL BE DONE WITHIN 4 TO 12 HOURS AFTER FINISHING,DEPENDING ON <br /> WEATHER. ENGINEER BB <br /> 7.FLOOR SHEATHING SHALL BE 3/4"PLYWOOD OR OSB WITH 10d AT 6"NAILING AT <br /> EDGES&BLOCKING AND AT 12"AT FIELD <br /> 8.ROOF SHEATHING SHALL BE I/2"PLYWOOD OR OSB WITH 8d AT 6"NAILING AT EDGES REVISION SCHEDULE <br /> &BLOCKING AND AT 12"AT FIELD <br /> " IMPORTANT NOTES ON TRUSS AND LUMBER PACKAGE/LUMBER PACKAGE REVIEW: NO. DATE DESCRIPTION <br /> 1.TRUSS FRAMING LAYOUT SHOWN IS GENERAL CONCEPT ONLY.CONTRACTOR/ <br /> TRUSS SUPPLIER MUST SUBMIT TRUSS SHOP DRAWINGS INCLUDING TRUSS <br /> TEMPORARY/PERMANENT BRACING PLANS FOR ENGINEER'S REVIEW <br /> 2.TRUSS FRAMING PROFILE/LAYOUT SHOULD CONFORM TO BOTH STRUCTURAL AND <br /> ARCHITECTURAL DRAWINGS.ANY DEVIATIONS SHALL BE APPROVED BY ENGINEER/ <br /> ARCHITECT PRIOR TO TRUSS DESIGN WORK. <br /> 3.TRUSS DEFLECTION CRITERIAS: <br /> FLOOR/DECK TOTAL LOAD=U480 ROOF TOTAL LOAD=L/240 <br /> FLOOR/DECK LIVE LOAD =U600 ROOF SNOW LOAD=U300 <br /> "MAXIMUM TOTAL LOAD DEFLECTION SHOULD NOT EXCEED 1.0"IN ALL CASES <br /> 4.FLOOR/ROOF FRAMING LAYOUT AND CONNECTORS(SUCH AS LUMBER PACKAGE BY <br /> SUPPLIERS)MUST BE SUBMITTED FOR ENGINEER'S REVIEW PRIOR TO CONSTRUCTION <br /> FRAMING SYMBOLS: O <br /> z SIMPSON WSW WOOD (pl CONTINOUS <br /> S 4 STRONG WALL(24"WIDE) ``7� POST <br /> PLYWOODo FRAMING PLANS <br /> FJ SHEARWALL Q BELOW THIS FLOOR <br /> AND DETAILS <br /> 1 R POST STARTS AT <br /> OA SHEARWALL HOLDOWN THIS FLOOR <br /> 0LEGEND AND NOTES S�1 <br /> \_J 1/4s_1�_0, <br /> Copyright b2 SWclural Engineers 2008 <br />