J FLOOR PLAN
<br /> FLOOR PLAN SHEET NOTES: KEY NOTES: (/)
<br /> 1 1. REFER TO ELECTRICAL DRAWINGS FOR INFORMATION ON ALL 1O REFER TO SHEET I-CS.1 FOR SCOPE OF WORK IN WAREHOUSE.
<br /> ELECTRICAL AND DATA DEVICES,REQUIREMENTS,ETC. O MODIFY/PROVIDE ELECTRICAL,MECHANICAL AND LIFE SAFETY SYSTEMS p v
<br /> r 1
<br /> AS REQUIRED BY SCOPE OF WORK ACCORDING TO MOST CURRENT 2. GENERAL CONTRACTOR TO PROVIDE ALL REQUIRED BLOCKING, ISSUE OF APPLICABLE BUILDING CODES INCLUDING,BUT NOT LIMITED
<br /> BRACING AND SUPPORTS AS NECESSITATED BY THE GOVERNING TO CIRCUITING,SWITCHING,DUCTING(SUPPLIES/RETURNS),BALANCING,
<br /> CODE. SPRINKLER HEAD AND/OR HORN/STROBE RELOCATION.REFER TO ME uj
<br /> 3. DO NOT SCALE DRAWINGS,WRITTEN DIMENSIONS GOVERN.ALL DRAWINGS FOR MORE INFORMATION.
<br /> PARTITION LOCATIONS SHALL BE AS SHOWN ON PARTITION PLAN. Q3 NEW WALL CONSTRUCTION.REFER TO PARTITION LEGEND FOR
<br /> N CASE OF CONFLICT NOTIFY ARCHITECT.PARTITION PLAN BY ADDITIONAL INFORMATION. T
<br /> ARCHITECT TAKES PRECEDENCE OVER ALL OTHER PLANS. O NEW EXTERIOR ENTRY DOORS.REFER TO DOOR SCHEDULE AND 1 "o
<br /> 4. ALL PARTITIONS ARE DIMENSIONED FROM FINISH FACE OF ELEVATIONS. y
<br /> N
<br /> GYPSUM BOARD TO FINISH FACE OF GYPSUM BOARD UNLESS O NEW WALL CONSTRUCTION AT WINDOW.REFER TO DETAIL 9&13/1-9.1 I l
<br /> WAREHOUSE 17'�" OTHERWISE NOTED.ALL DIMENSIONS MARKED"CLEAR"OR"CLR" FOR HEAD AND SILL DETAIL. v
<br /> .3
<br /> 112 ______ ______ SHALL BE MAINTAINED AND SHALL ALLOW FOR THICKNESS OF ALL 8 N
<br /> �I WALL FINISHES,U.N.O. O FULL HEIGHT Rd BATE INSULATION.STICK PINNED TO CONCRETE PANEL,NP. z
<br /> 5 1 IJ.7 8 . DIM ELEVATIONS AND FINISH SCHEDULE. O
<br /> ENSIONS NOTED"CLEAR"OR"CLR"MUST BE ACCURATELY O7 PROVIDE AND INSTALL WINDOW FILM AT TOP PANEL OF GLASS.REFER TO DOOR p
<br /> MAINTAINED,AND SHALL NOT VARY MORE THAN t 1/8"WITHOUT \\ 00
<br /> 10 B B O9 WRITTEN INSTRUCTION FROM ARCHITECT. O PROIADE
<br /> AND INSTALL LOW E WINDOW FILM AT TOP PANEL OF GLASS(2'X LENGTH Q Ol
<br /> PER
<br /> S. DIMENSIONS MARKED t MEAN A TOLERANCE NOT GREATER NOR
<br /> SMALLER THAN 2 INCHES FROM INDICATED DIMENSION,U.N.O. PARTITION LEGEND: +s,
<br /> C RR VERIFY FIELD DIMENSIONS EXCEEDING TOLERANCE WITH THE N
<br /> 107 g g 108 ARCHITECT.SECURE ARCHITECT'S APPROVAL. EXISTING SHELL&CORE WALLS I^� P N
<br /> 7. NOTIFY ARCHITECT IN WRITING OF ANY DISCREPANCIES OR e� ♦ P m
<br /> �i OPEN S 4'-10' - CONFLICTS IN THE LOCATION(S)OF NEW CONSTRUCTION,UPON NEW PARTITION.REFER TO DETAIL 3/I.9.1
<br /> n OFFICE COMPLETION OF PARTITION LAYOUT,NOTIFY ARCHITECT.
<br /> 104 ______ VERIFICATION OF THE LAYOUT TO BE PROVIDED BY THE e
<br /> 2 3 8 � D ARCHITECT PRIOR TO PARTITION INSTALLATION. e� NEW FULL HEIGHT TO STRUCTURE.REFER TO
<br /> B F igg DETAIL 4/1-9.1
<br /> Q TYP.THROUGHOUT 8. REFER TO REFLECTED CEILING PLANS FOR SOFFITS,CEILING Sports Art
<br /> 1 SCOPGENWORK U.N.O. BREAK HEIGHTS AND PLENUM BARRIER LOCATIONS.
<br /> NEW FURRING PARTITION.REFER TO DETAIL 511-9.1
<br /> GENERAL 105 OFFICE , 9. DIMENSIONS LOCATING DOORS ARE TO THE INSIDE EDGE OF BRIDGE POINT EVERETT
<br /> 11 C'" JAMB.U.N.O. 5OO
<br /> -0.1 5 IJ.1 a SERVER
<br /> 102 4 NEW FULL HEIGHT WALL TO 12'•0"A.F.F.REFER TO
<br /> OPEN 111 10. "ALIGN"MEANS TO ACCURATELY LOCATE FINISHED FACES IN THE DETAIL 8/I-8.1
<br /> OFFICE SAME PLANE.
<br /> 4 103 7 c g c l A c D 5900 36TH AVE WEST
<br /> 12 11. ALL DOORS SHALL HAVE V-6"CLR.ON STRIKEIPULL SIDE AND 1'4" BLDG C - SUITE 100
<br /> CLR.(WHEN BOTH A LATCH AND A CLOSER ARE PROVIDED)ON
<br /> -91
<br /> C � C VESTIBULE ii 8 Q PUSH SIDE OF DOOR.VERIFY AND ADVISE ARCHITECT OF EVERETT, WA 98203
<br /> 101 II 1 EXCEPTIONS PRIOR TO CLOSING OUT PARTITIONS. SYMBOLS LEGEND:
<br /> 7 II F.E.C.
<br /> I I I I I o I o BUILDING STANDARD FIRE EXTINGUISHER CABINET(OR
<br /> J.II II 8 II II E. SPEC)
<br /> I I I I 4 I FIRE EXTINGUISHER
<br /> WALL TAG
<br /> DESIGN JPC
<br /> DRAWN JC,TL
<br /> NO DESIGNATION = EXISTING TO REMAIN CHECKED JC
<br /> N = NEW&/OR RELOCATED(COORDINATE RELOCATED NO. 24-0167
<br /> ITEMS W/ARCHITECT)
<br /> FLOOR PLAN
<br /> " SCALE:1/S"=l'-U
<br /> REFLECTED CEILING PLAN
<br /> REFLECTED CEILING PLAN SHEET NOTES: WHITING CODE NOTES: SYMBOLS LEGEND
<br /> 1. COORDINATE THE WORK OF ALL TRADES INVOLVED IN THE CEILING 1. EGRESS LIGHTING SHALL BE DESIGNED BY A LICENSED ELECTRICAL TYPE SYMBOL MANUFACTURER DESCRIPTION
<br /> WORK TO ENSURE CLEARANCES FOR FIXTURES,DUCTS,PIPING, ENGINEER BASED ON FINAL FLOOR PLAN(S)AND THE MOST
<br /> p CEILING SUSPENSION SYSTEM,ETC.,NECESSARY TO MAINTAIN THE CURRENT(IN FORCE)ISSUE OF THE IBC,IEC AND LOCAL F-X BLDG STD EXIT LIGHT
<br /> FINISHED CEILING HEIGHTS INDICATED ON ARCHITECT'S DRAWINGS. CODES/ORDINANCES.IT SHALL REMAIN THE SOLE RESPONSIBILITY eves REGISTERED
<br /> OF THE ENGINEER TO COMPLETE A SCOPE OF WORK THAT
<br /> 2. FURNISH AND INSTALL ALL ASSOCIATED TRIM AND SEISMIC BRACING ADDRESSES ALL EGRESS LIGHTING I.C.;ROOMS,SPECIALIZED ARMSTRONG PRODUCT:DUNE SECOND LOOK II ARCHITECT
<br /> AS REQUIRED. SPACES,PATHWAYS,ETC.PER THE AFOREMENTIONED CODES. ACT-1 SIZE:24"X 48" J�
<br /> GRID:15/161, R.�-
<br /> 3. ALL SOFFITS AND CEILING HEIGHTS ARE DIMENSIONED FROM TOP 2. MEANS OF EGRESS ILLUMINATION:THE MEANS OF EGRESS(EXIT GWB CEILING,PAINT FINISH ANN KUSA..,.
<br /> OF FINISHED FLOOR TO BOTTOM OF FINISHED GYPSUM BOARD OR PATHWAY)AND THE EXIT DISCHARGE DOOR SHALL BE ILLUMINATED GWB-1 STATE OF WASHINGTON
<br /> CEILING TILE AND SHALL ALLOW FOR THICKNESS OF ALL FLOOR AT ALL TIMES THE BUILDING IS OCCUPIED ATAN ILLUMINATION m
<br /> FINISHES. LEVEL NOT LESS THAN 1-FOOT CANDLE(10 LUX)AT THE WALKING BLDG 2x4 LED
<br /> SURFACE PER 1008.2 PER 1008.3 EMERGENCY POWER FOR F-1 3000K-5000K ADJUSTABLE
<br /> 4. THE REFLECTED CEILING PLAN INDICATES THE LOCATION OF ILLUMINATION:THE POWER SUPPLY FOR MEANS OF EGRESS
<br /> CEILING HEIGHTS,LIGHT TYPES,LIGHT FIXTURES,AND ASSOCIATED ILLUMINATION SHALL NORMALLY BE PROVIDED BY THE PREMISES/
<br /> ITEMS. ELECTRICAL SUPPLY. JUNO RECESSED 4"LED DOWNLIGHT
<br /> F-2 WR4-SWW5-4000K-90CRI-MW 04,19,2024 PERMIT SET
<br /> 5. ALL SPECIFIC INFORMATION CONCERNING INSTALLATION FOR 3. LIGHTING CONTROLS: GRID INSTALL Q 06.05.2024 PERMIT REVISION REV1
<br /> F< Fd w VARIOUS ABOVE-CEILING ELEMENTS ARE TO BE DESIGN BUILD, SURFACE MOUNTED LED STRIP 1
<br /> s DOCUMENTATION BY OTHERS-PERMITTED SEPARATELY. -LOCATION OF DEVICES TO BE CONFIRMED WITH CLIENT AND ARCHITECT. F-3 Cm 6"X48"-WHITE-22WATTS-ACRYLI
<br /> 1 -CLIENT TO PROVIDE HOURS OF OPERATION FOR LIGHTING CONTROL LENSE
<br /> w 6. NOTIFY ARCHITECT OF ANY CONFLICTS OF LIGHT FIXTURE -ESTEM
<br /> C TO DESIGN TO MEET WSEC2018 WAG WALL MOUNTED LED STRIP
<br /> LOCATIONS WITH MAIN RUNNERS,DUCTS,STRUCTURES,HVAC, F-4 WALL MOUNTED
<br /> LE
<br /> AND/OR A C IES B T, PRIOR C FRAMING FOR LIGHTS.ANY 4. PROVIDE OCCUPANCY SENSORS FOR LIGHTING PER WSEC.
<br /> A 1 BK
<br /> GWB DISCREPANCIES BETWEEN ARCHITECTS CEILING GRID LOCATION& RECESSED 4"LED DOWMLIGHT
<br /> 8'-0" ACTUAL FIELD CONDITIONS ARE TO BE CLARIFIED WITH THE JUNO
<br /> 1 -0 OF-6 OF s - ARCHITECT PRIOR TO FRAMING. 5. PROVIDE DAYLIGHT RESPONSIVE CONTROLS COMPLYING WITH F-5 � WR4SWW5-4000K-90CRI-MW
<br /> 5
<br /> 7 WSEC C405.2.4.1 DRYWALL INSTALL
<br /> TYP.ALL RR 7. SUBMIT GRILLE,THERMOSTAT,AND OTHER FIXTURE AND ELEMENT
<br /> 1 1 1 2 3 8 1 + - GWB LAYOUTS TO THE ARCHITECT FOR REVIEW AT LEAST 2 WEEKS PRIOR
<br /> + + + + + + + + 114' TO INSTALLATION.
<br /> TM.TH OU Ho DAYLIGHT ZONE KEYNOTES:
<br /> + + + + + + + + S PE F 2 2 5..0.. 8'-0"+ 8. VERIFY FIELD CONDITIONS AND LOCATIONS OF ALL PLUMBING,
<br /> MECHANICAL DUCTS,STRUCTURAL ELEMENTS AND ALL OTHER ALL LIGHTING AND CONTROLS TO CONFORM TO 2016 WSEC O REFER TO SHEET I-CS.1 FOR SCOPE OF WORK IN WAREHOUSE.
<br /> + + + + + za RELATED ITEMS.INSTALL NEW PLUMBING,MECHANICAL,FANS, CODE SECTIONS C405.2.1 THROUGH C405.2.7
<br /> + 1 + + + 1 + + 1 1 1 a DUCTS,CONDUITS,AND OTHER RELATED ITEMS SO AS TO NOT O HVAC SUPPLY/RETURN NOT SHOWN.REFER TO DESIGN BUILD
<br /> w MECHANICAL PLANS VERIFY/COORDINATE LOCATION OF NEW LIGHT
<br /> AIRES.CONFLICT WITH ANY/ALL FIELD CONDITIONS INCLUDING LUMINAIRES. HATCH INDICATES DAYLIGHT ZONE 1
<br /> + + + + + + + + i � ,��. � 3 FIXTURES WITH NEW EQUIPMENT.
<br /> 4 P-z 9. INSTALL NEW LIGHT FIXTURES WITH PROTECTIVE FILM OR SIMILAR MODIFY EXISTING ELECTRICAL,MECHANICAL,AND LIFE SAFETY
<br /> -1 Fa 5 G c COVER OVER LOUVER,LENS,BAFFLE,ETC.TO AVOID FIXTURE O SYSTEMS AS REQUIRED BY SCOPE OF NEW WORK,INCLUDING,BUT
<br /> SOILING OR DAMAGE,FIXTURES SHALL BE MAINTAINED CLEAN AND + HATCH INDICATES DAYLIGHT ZONE 2 NOT LIMITED TO CIRCUITING,SWITCHING,DUCTING
<br /> AS NEW.ALL LAMPS SHALL BE NEW AT PROJECT COMPLETION-
<br /> a 8 + (SUPPLIES/RETURNS),BALANCING AND/OR HORN/STROBE
<br /> RELAMP EXISTING FIXTURES. RELOCATION.USE THE MOST CURRENT ISSUE OF APPLICABLE
<br /> BUILDING CODES.IT IS INTENDED THAT ARCHITECTURAL FEATURES
<br /> IbF aI I'I1-el I I I 10. ALL EXITING LIGHTS AND EGRESS LIGHTING LOCATIONS SHALL BE AND LIGHTING TAKE PRECEDENCE OVER MECHANICAL SYSTEMS.
<br /> DETERMINED BY BUILDING AND FIRE INSPECTOR'S FIELD FAILURE TO COORDINATE POTENTIAL CONFLICTS DURING THE DUE JURISDIcnOK FLOOR PLAN &
<br /> --- I I PLACEMENT DETERMINATION. DILIGENCEIDESIGN PROCESS WILL NOT WAIVE RESPONSIBLITY TO THE
<br /> FINAL DESIGN INTENT AS PRESENTED IN THE ARCHITECTS
<br /> I I I I CONSTRUCTION DOCUMENTS. REFLECTED
<br /> PROVIDE AND INSTALL NEW BUILDING STANDARD EXIT SIGN.FINAL
<br /> LOCATION SHALL BE DETERMINED BY BUILDING AND FIRE INSPECTOR'S CEILING PLAN
<br /> FIELD PLACEMENT DETERMINATION.
<br /> Q5 PROVIDE AND INSTALL NEW GWB CEILING.PAINT P-2.
<br /> © PROVIDE AND INSTALL NEW SUSPENDED CEILING SYSTEM WITH
<br /> THERMAL BATT INSULATION&SUSPENDED CEILING SYSTEM WITH ACT.
<br /> REFLECTED CELING PLAN REFER TOSHTFIXT FIXTUR AND E OVER LING
<br /> REFER
<br /> I� 2. 1
<br /> „ 7 INSTALL LIGHT FIXTURE OVER MIRROR.REFER TO INTERIOR I
<br /> SCALE 1/8"=1'-0" O ELEVATIONS,
<br /> Og NEW SHEATHING AT VESTIBULE.ALIGN WITH EXISTING.PAINT FINISH.
<br /> JPC Prc1,IbM,L.