Laserfiche WebLink
Q A PORTION OF SECTION 18,TOWNSHIP 28 NORTH, RANGE 05 EAST,W.M. y s <br /> UNDERGROUND UTILITIES NOTES: W - <br /> 1. The WSDOT/APWA Standard Specifcation shall apply unless otherwise stated below. <br /> 2. When trenching through existing pavement,the open cut shall be a neat line made by either saw cutting orjackhommering 0 <br /> LEGEND a continuous line.Saw cutting will be required unless the cut is made prior toe reconstruction or an overlay. O W <br /> Boundary Line r. <br /> -------------- Existing Path Design Path Design Filter$frlP 3. Temporary pavement patch shall be accomplished by using cold mix(MC 250),ATB or steel plates. J Z N <br /> ............. <br /> Design Right-of-Way Line Design Building -v+- Design Water Line Design Area of Disturbance N N <br /> g g y g g g � / g 4. Permanent pavement patch shall be as specified on Standard Drawing 326. W n <br /> Existing Right-of-Way Line -- Existing Building --w---w-- Existing Water Line X Design Temporary Silt Fence 5. where trench excavation equals or exceeds a depth of 4 feet,the developer/contractor/conhactor shall tle,construct,maintain O O,� <br /> I <br /> and remove as re qua p per pnvi >Q� <br /> Design Major Contour Line -------------- Design Building Setback Line .R -0 Design/Existing Water Hydrants Temporary Consiruc}ion Enhance required,safety systems that meet the requirements of the Washington Industrial Safety and Health Act,RCW >>> 3 <br /> 4ngin including WACents(s5.The french safety systems shall be designed by a qualified person and meet accepted -2 N <br /> Existing Major Con}our Line -so- Design Storm Drainage Line B ® Design/Existing Water Fittings G#as Existing Soil Log engineering requirements(see wAC 296-155-660). >_� <br /> Design Minor Contour Line ��ro Ill IM Existing Storm Drainage Line X Design Fence >r>r>r BMP Designations W !6�6 <br /> 6. The developer/contractor shall furnish,inntall,and operate all necessary equipment to keep excavations above the <br /> Existing Minor Contour Line �p ❑ Design/Exisfing Type 1 Catch Basin X Existing Fence foundation level free from wafer during construction,and shall dewater and dispose of the water so as not to cause injury to I- 0)(✓) <br /> public or private property or nuisance to the public.Sufficient pumping equipment in good working condition shall be O <br /> - - - Phase Line G) O Design/Existing Type 2 Catch Basin - - - Existing Weiland Line/Hatch Designed Bioreten}ion Cell available at all times for all emergencies,including power outage,and shall have available at all times competent workmen N Q <br /> /Rain Garden for the operation of the pumping equipment.Water pumped from the trench shall be disposed of using best management ED <br /> Design Tract Line • O Design/Existing Storm Drain Clean-out - Design Buffer Line/Hatch practices and shall not be pumped into streams nor to stone drains near streams. 10 <br /> Design Lot line -*o- Design Yard Drain Line ---- Existing Buffer Line/Hatch 7. Compaction tests will be required to ensure adequate compaction on all lifts.All compaction tests shall be considered by a Z <br /> Existing Lot Line 0 ❑ Design Yard Drain Catch Basin - - - Existing Section Line I I licensed testing laboratory at the expense of the developer/contractor. 44 <br /> ---- Design Easement Line • O Design Yard Drain Clean-out Existing Section Symbol \ Dispersion Trench/Level Spreader 8. Reference to the City Engineer below means the city's representative on site. J <br /> ------- Existing Easement Line --ore---oxv-- Existing Power Line I 9. Water setting of backfill in trenches is not permitted. , <br /> Design Shed Dispersion <br /> Design Road Centerline , , r � Existing Power Symbol y 3�` 1` i i Existing Road Centerline Tr Design Drainage Basin --r---r---.-- Existing Telephone Line O <br /> C - <br /> Site Benchmark ---- Design Swale Line Existing Telephone Symbol Cl (2) (3) NGPA signs p 0 <br /> Existing Benchmark - -- -- Existing Ditch line --a---a-- Existing Gas Line v o <br /> Design Edge of Asphalt -ss- Design Sanitary Sewer Line Existing Symbol <br /> 0 g Gas STORM DRAINAGE NOTES: i <br /> Existing Edge of Asphalt --..---ss-- Existing Sanitary Sewer Line Existing Flow Path 1. No part of the drainage system shall be covered,concealed,or put into use until it has been inspected,tested,and <br /> 0 Design Sidewalk 0 O Design/Existing Sanitary Sewer Manhole `-ti...`i Existing Tree Drip Line accepted by the City of Everett. 3 <br /> Existing Sidewalk • O Design/Existing Sanitary Sewer Clean-out 2. All work and material shall conform to the City of Everett Design and Construction Standards and Specifications and the <br /> WSDOT/SPWA Standard Specifications for Road,Bridge,and Municipal Construction(Current Edition). <br /> Design Driveway Line/Hatch -sr- Design Sanitary Side Sewer 3. Approximate locations of existing filities have been obtained from available records and are shown for conveyance.The DER S. <br /> CST <br /> contractor <br /> gu y <br /> tractor shall be responsible for verification of locations and to avoid damage to any additional utilities shown.If conflicts Fl pE� fP <br /> with existing utilities arise during construction,the contractor shall notify the Public Works Inspector and any changes required <br /> shall be approved by the City Engineer prior to commencement of related construction on the project. - <br /> 4. All stone systems within the public right-of-way or in easements must be staked by survey for line and grade prior to starting construction. <br /> 5. All catch basin grates must be stenciled or stamped"Dump no Waste,Drains to Stream,Lake,River,Puget Sound,or <br /> Wetland:'Choose appropriate feature for the project. <br /> 0712512023 <br /> 6. Shall comply with the Everett Municipal Code(EMC),City adopted Stormwater Management Manual,policies and criteria <br /> set forth in the City of Everett s Design and Construction Standards and Specifications. <br /> EROSION/SEDIMENTATION CONTROL NOTES: <br /> 1. Approval of this erosion/sedimentation control ESC)plan does not constitute an approval of permanent road or drainage <br /> design(e.g.size and location of roads,pipes,restrictors,channels,retention facilities,utilities). <br /> 2. The implementation of these ESC plans and the construction,maintenance,replacement,and upgrading of these ESC N <br /> facilities is the responsibility of the applicant/contractor until all construction is completed and approved and <br /> vegetation/landscaping is established. y Q w <br /> ti <br /> 3. The boundaries of the clearing limits shown on this plan shall be clearly flagged in the field prior to construction.During the �}g Z Q w <br /> onstruction period no disturbance beyond the flagged cleaning limits shall be permitted.The flagging shall be maintained w m}0 Q <br /> by the applicant/conhactor for the duration of construction. J 0 Z y <br /> w U <br /> 4. The ESC facilities shown on this plan must be constructed in conjunction with all clearing and grading activities,and in such a w 3 x Q O¢ <br /> as to ensure that sediment and sediment laden wafer do not enter the drainage system,roadways,or violate A w p m <br /> applicable water quality standards. x U m <br /> 5. The ESC facilities shown on this plan are the minimum requirements for anticipated site conditions.During the construction .j <br /> period,these ESC facilities shall be upgraded as needed for unexpected storm events and to ensure that sediment-laden <br /> wafer do not leave the site. .;r <br /> 6. The ESC facilities shall be inspected routinely and maintained bye the applicant/contractor to ensure their continued Q <br /> functioning,especially after storm events. 3 N ED <br /> N w <br /> 7. The ESC facilities on inactive site shall be inspected and maintained a minimum of once a month or within the 48 hours w N <br /> following a major storm event. <br /> d <br /> 00 <br /> 8. At no time shall more that one foot of sediment be allowed to accumulate within a trapped catch basin.All catch basins Z C coand conveyance lines shall be cleaned prior to paving.The cleaning operation shall not flush sediment-laden wafer into the N ¢ fl.N <br /> downstream system. R O <br /> L a Q N <br /> 9. Stabilized construction entrances shall be installed at the beginning of construction and maintained for the duration Ic dn of the Q 2 tL O <br /> project.Additional measures may be required to ensure that all paved areas are dept clean for the duration of the project. Z yCD <br /> 7 c0 <br /> 10. The Contractor shall provide periodic sheet cleaning to remove debris and sediment hacked off the site. _ a aO+T O <br /> 11. Appropriate measures shall be taken to stop sediment from entering surface water bodies if the proposed BMP's fail.If 3MP's w x N <br /> fail and sediment-laden wafer is leaving the site,immediately notify your Public Works Inspector. H 3 V <br /> 12. Bare and/or disturbed soils shall remain uncovered and/or unstabilized for no more than 2 days from October 1 through April Q <br /> 30,and for no more than 7 days from May I through September 30. <br /> 13. Notify the City Public Works Inspector at least 24 hours prior to dowatering activites.Handle highly turbid or otherwise U o Z <br /> w <br /> contaminated de-watering water separately from stormwater. a U <br /> 14. The approved t Public Works t and SWPPP shall be retained on site or readily available to the contractor <br /> ul <br /> pprove project permit yavai y <br /> throughout the duration of the construction project. r/) <br /> z LU <br /> 15. Design,install,implement,and maintain effective pollution prevention measures to minimize the discharge of pollutants. 0 O <br /> 16. Protect all LID BMP's from setlimentafion through installation and maintenance of erosion and sediment control BMP's on a Z <br /> portions of the site that drain into the LID BMP's. <br /> Z <br /> O <br /> U <br /> WATER DISTRIBUTION NOTES: 1 <br /> 1. No connection to the existing mains will be allowed except means of an approved ba prevention device prior to <br /> satisfactory flushing,testing,disinfection,and receipt of satisfactory bacteriological test results. <br /> tin <br /> 7- <br /> 2. Connections to and taps on existing mains will be made by the Public Works Department at the developers expense.The O <br /> Public Works Department shall be given at Ieari 5 business days notice for each connection.The Public Works Department of /1 <br /> shall thereafter determine the date and time at which the connection shall be made. /, $ V <br /> 3. All work and materials must conform to City of Everett Standards. J Q <br /> J <br /> 4. A pre-construction meeting shall be held with the City prior to the start of construction.The City of Everett Public Works <br /> Construction Division must be notified at least 24 hours prior to commencement of construction. <br /> 5. The developer or the developer's authorized agent shall notify the Public Works Department of a person who can be mo <br /> contacted regarding problems during construction on a 24 hour basis. Q <br /> 6. Maintain a minimum of 10 feet horizontal and 18 inches vertical separation between potable and non-potable conveyance r <br /> asystems. <br /> 7. All City of Everett valves shall be operated by Public Works Department personnel only.All valves,new and existing,shall be <br /> 0 <br /> Z accessible at all times. x <br /> 0 <br /> y <br /> U <br /> o 76 <br /> U m <br /> SANITARY SEWER NOTES: <br /> 1. All work and materials shall conform to the City of Everett Standards and WSDOT/APWA Standard Specifications. <br /> 2. No part of the sanitary sewer system shall be covered concealed or put into use until if has been tested,inspected and <br /> approved by the city inspector. <br /> 0 3. Approximate locations of existing utilities have been obtained from available records and are shown for convenience.The <br /> contractor shall be responsible for verification of locations and to avoid damage to any additional utilities not shown.If <br /> 0 conflicts with existing utilities arse during construction,the contractor shall notify the public works inspector and any changes <br /> N required shall be approved by the City Engineer prior to commencement of related construction on the project. <br /> 4. All sewer main extensions within the public right-of-way or in easements must be staked by survey for line and grade prior to <br /> E , startingtruction.cons SHEET <br /> UNDERGROUND UTILITY NOTE EG2 a} EG7 <br /> Underground utility locations shown hereon are based <br /> upon surface indicators.No underground location 24x36 <br /> service was utilized for their location.The use of this <br /> - map for their exact location is not wartanfed.Prior to <br /> construction user shouid call the utility location service PW2303-017 <br /> at 1-800-424-5555 48 hours before construction. <br />