My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1302 SE EVERETT MALL WAY 1 2023 TRADER JOES Plans 2025-04-08
>
Address Records
>
SE EVERETT MALL WAY
>
1302
>
TRADER JOES
>
Plans
>
1302 SE EVERETT MALL WAY 1 2023 TRADER JOES Plans 2025-04-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 8:54:42 AM
Creation date
4/8/2025 8:53:23 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1302
Unit
1
Tenant Name
TRADER JOES
Permit
PW2301-012
Year
2023
Notes
SITE WORK - NEW UTILITIES, MODIFY EXTG PARKING AND DRIVEWAYS
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT STORM DRAINAGE NOTES CITY OF EVERETT WATER DISTRIBOON NOTES <br /> 1. NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED, OR 1. NO CONNECTION TO THE EXISTING MAINS WILL BE ALLOWED EXCEPT BY EVERETT SHOPS <br /> PUT INTO USE UNTIL IT HAS BEEN INSPECTED, TESTED, AND ACCEPTED MEANS OF AN APPROVED BACKFLOW PREVENTION DEVICE PRIOR TO <br /> BY THE CITY OF EVERETT. SATISFACTORY FLUSHING, TESTING, DISINFECTION, AND RECEIPT OF REDEVELOPMENT <br /> SATISFACTORY BACTERIOLOGICAL TEST RESULTS. <br /> 2. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT L City of Everett Permit Review <br /> DESIGN AND CONSTRUCTION STANDARDS AND SPECIFICATIONS AND THE 2. CONNECTIONS TO AND TAPS ON EXISTING MAINS WILL BE MADE BY THE EVERETT Status:Approved <br /> WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND PUBLIC WORKS DEPARTMENT AT THE DEVELOPER'S EXPENSE. THE PUBLIC 08/05/2023 11:15:25AM <br /> MUNICIPAL CONSTRUCTION (CURRENT EDITION). WORKS DEPARTMENT SHALL BE GIVEN AT LEAST 5 BUSINESS DAYS NOTICE <br /> FOR EACH CONNECTION. THE PUBLIC WORKS DEPARTMENT SHALL <br /> 3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED THEREAFTER DETERMINE THE DATE AND TIME AT WHICH THE CONNECTION <br /> FROM AVAILABLE RECORDS AND ARE SHOWN FOR CONVENIENCE. THE SHALL BE MADE. <br /> CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF LOCATIONS <br /> AND TO AVOID DAMAGE TO ANY ADDITIONAL UTILITIES SHOWN. IF 3. ALL WORK AND MATERIALS MUST CONFORM TO CITY OF EVERETT <br /> CONFLICTS WITH EXISTING UTILITIES ARISE DURING CONSTRUCTION, THE STANDARDS. <br /> CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR AND ANY <br /> CHANGES REQUIRED SHALL BE APPROVED BY THE CITY ENGINEER PRIOR 4. A PRE—CONSTRUCTION MEETING SHALL BE HELD WITH THE CITY PRIOR TO <br /> TO COMMENCEMENT OF RELATED CONSTRUCTION ON THE PROJECT. THE START OF CONSTRUCTION. THE CITY OF EVERETT PUBLIC WORKS <br /> CONSTRUCTION DIVISION MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR <br /> 4. ALL STORM SYSTEMS WITHIN THE PUBLIC RIGHT—OF—WAY OR IN TO COMMENCEMENT OF CONSTRUCTION. <br /> EASEMENTS MUST BE STAKED BY SURVEY FOR LINE AND GRADE PRIOR <br /> TO STARTING CONSTRUCTION. 5. THE DEVELOPER OR THE DEVELOPER'S AUTHORIZED AGENT SHALL NOTIFY <br /> THE PUBLIC WORKS DEPARTMENT OF A PERSON WHO CAN BE CONTACTED <br /> 5. ALL CATCH BASIN GRATES MUST BE STENCILED OR STAMPED "DUMP NO REGARDING PROBLEMS DURING CONSTRUCTION ON A 24 HOUR BASIS. <br /> WASTE, DRAINS TO STREAM, LAKE, RIVER, PUGET SOUND, OR WETLAND:' <br /> CHOOSE APPROPRIATE FEATURE FOR THE PROJECT 6. MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL AND 18 INCHES VERTICAL <br /> SEPARATION BETWEEN POTABLE AND NON—POTABLE CONVEYANCE SYSTEMS. <br /> 6. SHALL COMPLY WITH THE EVERETT MUNICIPAL CODE (EMC), CITY ADOPTED <br /> STORMWATER MANAGEMENT MANUAL, POLICIES AND CRITERIA SET FORTH IN 7. ALL CITY OF EVERETT VALVES SHALL BE OPERATED BY PUBLIC WORKS <br /> THE CITY OF EVERETT'S DESIGN AND CONSTRUCTION STANDARDS & DEPARTMENT PERSONNEL ONLY. ALL VALVES, NEW AND EXISTING, SHALL B R I X T O N <br /> SPECIFICATIONS BE ACCESSIBLE AT ALL TIMES. <br /> CITY OF EVERETT SANITARY SEWER NOTES <br /> 1. ALL WORK AND MATERIALS SHALL CONFORM TO THE CITY OF EVERETT <br /> STANDARDS AND WSDOT/APWA STANDARD SPECIFICATIONS. <br /> 2. NO PART OF THE SANITARY SEWER SYSTEM SHALL BE COVERED, <br /> CONCEALED OR PUT INTO USE UNTIL IT HAS BEEN TESTED, INSPECTED, 119 PINE STREET,SUITE 400 <br /> AND APPROVED BY THE CITY INSPECTOR. SEATTLE, WA 98101 <br /> T 206.223.0326 <br /> 3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED www.migcom.com <br /> FROM AVAILABLE RECORDS AND ARE SHOWN FOR CONVENIENCE. THE <br /> CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF LOCATIONS <br /> AND TO AVOID DAMAGE TO ANY ADDITIONAL UTILITIES NOT SHOWN. IF PHASE 1 PERMIT <br /> CONFLICTS WITH EXISTING UTILITIES ARISE DURING CONSTRUCTION, THE <br /> CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR AND ANY <br /> CHANGES REQUIRED SHALL BE APPROVED BY THE CITY ENGINEER PRIOR <br /> TO COMMENCEMENT OF RELATED CONSTRUCTION ON THE PROJECT. pVANE,0oFwwa��9� <br /> 4. ALL SEWER MAIN EXTENSIONS WITHIN THE PUBLIC RIGHT—OF—WAY OR IN -� <br /> EASEMENTS MUST BE STAKED BY SURVEY FOR LINE AND GRADE PRIOR 12 y <br /> TO STARTING CONSTRUCTION. <br /> 7-12-23 <br /> DATE: JANUARY 18 2023 <br /> REVISION : <br /> 1 04/19/2023 PW2301-012 Revisions <br /> 2 07/13/2023 PW2301-012 Revisions <br /> s <br /> S <br /> 3 <br /> DRAWN BY: MK SS JZ <br /> 3 <br /> CHECKED BY: MD <br /> JOB NO.: 15205 <br /> Sl <br /> CITY OF <br /> EVERETT NOTES <br /> SHEET NO.: <br /> C0.3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.