Laserfiche WebLink
TERRA POWER EVLB 2024 <br /> o _ =Do <br /> O•o AZii~ <br /> LEGEND - I 2 i� I� I� I I �} ALLY` °°q <br /> -----------L------------=-------------� ® ky f ,®1 ao$w � <br /> EXISTING PIPE <br /> -�_ o Uw 92 w <br /> 2'/a �ry� 9'-17 B b 2% w L <br /> -----------------•I;-rt- -- ---- - tip;9---_____;___ I / .€ •g - _ _ °000 <br /> L <br /> NEW PIPE 10'-010'-0 14'-8' o� <br /> _ _ <br /> - - - - - - - -I w 308 1'/. ♦309 y w+ 310 -`P' 311 r -_ I__ ..,...,w_C'J�® p • E9 Al .,.•..,-..._.. ,,.. °yam <br /> EXISTING ESFR """""" 12'A' • 21•-0 wti _•,.I 0 2•-10 R4DF-S 10'-0 ,� 128 waPw' I ,. ®-'=. 4 C• T.............__T <br /> 3D PRINTER <br /> •♦ I 4 122 123 w J -i © ") " - <br /> 2YS 9 I p 1B0 2'6 126 127'1 Cow P Raaww i bZ_L_e i i <br /> _____________ _____ w ________ <br /> _ _ _ •Y X € F r W 0 r <br /> • -' - Oraina Grou II.0.20 m/ft'for 566 ftl - '0 ..., ®� ev• u1 i <br /> I rY P 9P <br /> NEW QR PENDENT \ Q•♦+.� �4 ♦+b . �4 w+� <br /> 312 313 �T In rFW� r <br /> y_ 1'/.. '.�' •210 P b'r�);,+ 4 4 rwjc r <br /> _ _ �1+...... ..'�T.-�tG.....Y g. }..... ,TWA. DRAIN - �� 7 0 o- o- �:' €a > <br /> 1. w� 206 z07 209 210 1'/° 2 212 0 <br /> NEW R UPRIGHT l 4'A2,7 <br /> Q j, <br /> a� <br /> F 3 <br /> xs <br /> I p• �4t 0d <br /> i i <br /> - r- /'/y// /,III @ y@ a @ 5 @ EI HI .-„_. .•..•_• r f <br /> i <br /> A <br /> NEW ESFR _ _ � - EXISTING PUMP ROOM- NTS EXISTING RISER- NTS : <br /> LEVEL 1 <br /> NEW FULL HEIGHT WALL Hydraulic Information <br /> OCCUPANCY CLASSIFICATION Ordinary Group I g <br /> NEW DEMISING WALL r------------------------------------ DENSITY(gpm/ft2) 0.15for1500ft2(Actual566ft2) <br /> �---_______I 4 TOTAL HOSE STREAMS 250.00 <br /> �-------- <br /> _ _FP:1_.00 _ _ _ 1-_ _ - <br /> SCOPE: --- MT --, , 1 DRY CAPACITY 0.00 gal 8- <br /> 1.ADD 18 PENDENTS FOR NEW ACT/GWB CEILINGS.ADD 3 UPRIGHTS FOR _________ s _______- O ,�' e1r zv mr_., _-© -__ 1 __ I E <br /> `k--- --- I TOTAL HEADS FLOWING 8 <br /> STAIRS.ADD 3 NEW ESFR PENDENTS FOR DEMISING WALLS. 1 4/ 4I 4r a I K-FACTOR 5.6 <br /> 2.MAX SPACING 130 SQ FT FOR ORDINARY HAZARD 1 FOR RESEARCH AND _ _ I <br /> DEVELOPMENT. _ - W ;zb�gh 10-0 s 3a ♦+e z-10 10'-0 algto: I TOTAL WATER REQUIRED 401.87 <br /> MAX SPACING 100 SQ FT FOR ESFR SYSTEM. ILL ♦*p` LAs Rz w+ +P qs az "�+�� i TOTAL PRESSURE REQUIRED 51.455 LL <br /> 3.UNOBSTRUCTED COMBUSTIBLE CONSTRUCTION AT DECK. la zss w w zs3 1 q I o <br /> zss m' 4 MT ��' <br /> ------- -I- MT ��- _M_r -_�_n 2_i^_MT °_°_° BASE of RISER(gpm) 401.87 <br /> 4.INSTALL NEW OR SPRINKLER HEADS. ---------- <br /> -__� um <br /> �o- <br /> 5.UTILIZE FLEX DROPS. -- -- - a.9° 4 9P 4 . :B <br /> .L. FFL BASE of RISER(psi) 51.455 <br /> 6.PIPE SIZING WILL BE BY HYDRAULIC CALCULATION USING THE AREA/DENSITY , w+ w+ �'w+ w+ �� SAFETY MARGIN(psi) +16.796(24.6/o D <br /> ) <br /> METHOD.BASIS TO BE.15 GPM/FT SQ. ' <br /> ( �` � ♦+ <br /> . .. ...a... ..4.1 <br /> INTERLOCK <br /> VESTIBULE N Y <br /> GENERAL NOTES: zB, � <br /> 1.ALL DESIGN AND INSTALLATION IS IN ACCORDANCE WITH NFPA 13,2019 AND ---- Supply FIOW Test Data <br /> THE CITY OF T FIRE CODE. / �N 6"�� <br /> Static Pressure 70.000 PSI a N <br /> 2.ALL MATERIALIAL AND EQUIPMENT TO BE NEW AND UL AND FM LISTED. cn <br /> 3.BLACK SCHEDULE 40 FOR 1"SPRINKLER PIPE AND SCHEDULE 10 FOR ALL Residual Pressure: 50.000 PSI <br /> 1-1/4"-4"SPRINKLER PIPE. MEZZANINE LEVEL Flow 1500.00GPM ~a <br /> 4. 1"THREADED PIPE AND FITTINGS AND 1-1/4"-6"GROOVED PIPE AND D,D <br /> FITTINGS. Outside Hose Flow 250.00GPM -"'r" <br /> 5.PIPING DIMENSIONS ARE CUT LENGTH. OVERHEAD PIPING PLAN-TERRA POWER MEZZANINE if <br /> 6.HANGERS AND METHOD OF HANGING TO BE IN ACCORDANCE WITH NFPA 13 o R�_ z 1ROLE: ,4a = ,BD Y <br /> 2019. sr • 1 <br /> 7.JOINING OF PIPE AND FITTINGS,THREADED AND WELDED SHALL BE IN17 <br /> ACCORDANCE WITH NFPA 13 2019. T - - - - - - - - - - - - - - - - - - - - - <br /> 8.OWNER TO PROVIDE ADEQUATE HEAT TO PREVENT PIPE FROM FREEZING IN 1 <br /> AREAS PROTECTED BY WET PIPE SPRINKLER SYSTEM THAT IS NOT 6 <br /> PROTECTED BY HEAT TRACE. 7 I '_mg 2 <br /> 9.STRUCTURAL ADEQUACY OF THE BUILDING TO SUPPORT THE SPRINKLER 1 <br /> PIPING IS THE RESPONSIBILITY OF THE OWNER AND/OR STRUCTURAL -------------------------------------------------------------------------------------------------------------- cc I I S <br /> 4B-r mPlcgy 1 a <br /> REPRESENTATIVE. ml <br /> 1 Q 1 <br /> -------- ------------------------------------------- I 1 <br /> TOP OF PNUPET^^ <br /> ----1 I( Fvuxrtocsnox SERTCNCAPRAL(SFAWAV)-BUILDINGS <br /> -�•--' I I m 5188 <br /> I <br /> --_- µCTi1DNTYPE SB <br /> --_------__ eo.P000 DMe g)� ( uExoue trsatresaFT. <br /> `y5�.° a �.T t22tN 9O.FI. 1 <br /> 1 tot RRE suw FF� Ira �o�ar000 <br /> 'I ____ _____ _____ ____ ____ ____ __ <br /> j; j II - - - - - - - -- as mr9 <br /> T 1 T I v19�1 gP�N1aER � _--_-_ AREA OF VWRx <br /> j ---_- --------------- - - - - - - - - - - - - - - - - - - - -.TOP OF <br /> j 1 j Q W <br /> 1 j <br /> N <br /> W <br /> j • 1 T I j v <br /> •1 I 0 n <br /> It ---4._..s---J a <br /> Ig1m EEPWAT BOt11EV•M <br /> f <br /> y [3f J <br /> TOP°F-K N <br /> L... m LL <br /> SITE MAP - BRANCH LINE @ 12'-S J H ° <br /> -TRuss W = <br /> WDODT W x <br /> rc <br /> O:io I]mo LL <br /> - SgMMYSIDEWINDER Wm" El' <br /> BgMMY SCREW >a pa 0 <br /> r B.O.Lt COWxO V eIIO� 6 ygq _ = METAL MD FRAMING BOLT 104 ;13 W <br /> - -LB'ATR FlG.9305WIVEL Fmk ° 0 F I' <br /> L <br /> / 1°SCH.40PIaD ggpp/ RIN FlG.4• FROM VERT. 1 Fm> cabs e <br /> PPE RIN <br /> PE <br /> 2 r SAMW SIDEWINDER(WOOD)08W SAMMY FOR WOOD(VERTICAL)o6W LONGITUDINAL BRACE <br /> • <br /> L7I 17 0 <br /> - . .. - r PURWN <br /> V- (E)BRANCHLI <br /> ♦ Ep <br /> �411 �• -���. 1°DROP <br /> VAR <br /> LENGTH VARIES V IES <br /> NORTH ELEVATION VIEW OF MEZZANINE q`7`'i��-7, <br /> SCALE:NTS 1°DROP=+ <br /> LENGTH VARI qTR ar®qTe ca w.,ewi.e <br /> I ( 6AMMV OST � <br /> QWVICFLEXASSEMBLV _ °a s<o rrwcnntcxr ......w.F.v. <br /> 4�d a vL rc_rx_exee <br /> ACT/GVP BRACKET ING <br /> CEILING TILES B <br /> RECESSED PENDEM SPRINKLER ei•YRrwe wT.w`E'F91t wf�w� <br /> ICFLEX DETAI SAMMY DST oss #BLR-BRANCHLINE RESTRAINT FEB 1 6.2024 <br /> VICINITY MAP MEET NO. <br /> FP 1.00 <br />