My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2124 ROCKEFELLER AVE 2025-06-24
>
Address Records
>
ROCKEFELLER AVE
>
2124
>
2124 ROCKEFELLER AVE 2025-06-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2025 1:22:38 PM
Creation date
4/8/2025 10:44:24 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
2124
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number' M2006-055 Description: New air handler,heat pump and thermostat <br /> Applied:6/25/2020 Approved: 6/30/2020 Site Address: 2124 ROCKEFELLER AVE <br /> Issued:6/30/2020 Finaled: City,State Zip Code: EVERETT,WA 98201-2840 <br /> Status: EXPIRATION NOTICE SENT Applicant:ANP HEATING&A/C LLC <br /> Parent Permit: Owner:GHALY GHALY BASALIOUS/COMBELIC-GHALY SUE <br /> Parent Project: Contractor:ANP HEATING&A/C LLC <br /> Details: <br /> New air handler,heat pump and thermostat**SEPARATE ELECTRICAL NEEDED FOR TSTAT OR ALTER CIRCUIT****SUBJECT TO FIELD <br /> INSPECTION. OUTDOOR UNITS NOT TO BE INSTALLED IN ANY FRONT OR SIDE YARD SETBACK** <br /> New air handler,heat pump and thermostat <br /> AL A <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 12/14/2020 12/14/2020 PERMIT EXTENSION KATHY COLLISON EXTENSION COVID EXTENSION <br /> APPROVED <br /> Notes: <br /> 6/4/2021 6/4/2021 PERMIT EXTENSION KATHY COLLISON EXTENSION COVID EXTENSION <br /> APPROVED <br /> Notes: <br /> 3/16/2022 3/16/2022 MECH 06-FINAL JASON CORRECTION <br /> MORRISSEY REQUIRED <br /> Notes: <br /> Sue <br /> Email:suecombelic@gmail.com <br /> Home:425-258-4026 <br /> Cell 1:206-898-6155 <br /> Cell 2:206-683-6822 <br /> (3/16/2022 8:05 AM JJM) <br /> Contractor needs to pull an electrical permit before mechanical inspection is completed. <br /> Spoke with Sue she will inform ANP Heating of requirement for electrical permit. <br /> I <br /> Printed:Tuesday,08 April,2025 1 of 1 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.