Laserfiche WebLink
Earth Solutions NW TEST PIT NUMBER TP-5 <br /> I Lall0 rth 1805- Place N.E., Suite 201 PAGE 1 OF 1 <br /> tirJltI1IO I) Bellevuee,,Washington 98005 <br /> %N W I' Telephone: 425-449-4704 <br /> Fax: 425-449-4711 <br /> ICLIENT Veritas Construction PROJECT NAME Soundview Business Center <br /> PROJECT NUMBER 4011 PROJECT LOCATION Everett,Washington__ <br /> ' DATE STARTED 7/31/15 COMPLETED 7/31/15 GROUND ELEVATION _780 ft TEST PIT SIZE <br /> EXCAVATION CONTRACTOR NW Excavating GROUND WATER LEVELS: <br /> EXCAVATION METHOD AT TIME OF EXCAVATION - <br /> ' LOGGED BY BTS CHECKED BY BTS AT END OF EXCAVATION — <br /> NOTES Depth of Topsoil&Sod 10"-12":brambles AFTER EXCAVATION - <br /> I <br /> a. <br /> w <br /> _ ~w _ <br /> a-- g Q p MATERIAL DESCRIPTION <br /> p 2Z 2 <br /> Q a0 <br /> Brown silty SAND, medium dense to dense, moist(Weathered Till) <br /> I - - <br /> - gray,very dense,cemented(unweathered till) <br /> 1 L. - <br /> SM <br /> I - 5 <br /> I - - <br /> 7.0 773 <br /> I <br /> Test pit terminated at 7.0 feet below existing grade. No groundwater encountered during excavation. <br /> Bottom of test pit at 7.0 feet. <br /> I <br /> I <br /> I <br /> I <br /> O <br /> U) <br /> D <br /> I 0 <br /> Z <br /> (7 <br /> a <br /> 9 <br /> 0 <br /> NI- <br /> IJ <br /> I m <br /> U) <br /> w <br /> Z <br /> W <br />