Laserfiche WebLink
I <br /> 9. Earth <br /> Solutions <br /> NW-Lc <br /> June 17, 201Earth Solutions NW LLC <br /> Revised Juneune 22, 2016 <br /> ES-4011.03 <br /> • ( t-ii�meEriiir; <br /> • ( Mo th it <br /> • Environnu n1,11 SriOtO Y, <br /> I <br /> Veritas Construction, Inc. <br /> 22819 —Woodway Park Road <br /> Woodway, Washington 98020 <br /> Attention: Ms. Ashley Previs <br /> Dear Ms. Previs: <br /> Earth Solutions NW, LLC (ESNW) is pleased to present this report titled "Geotechnical <br /> Engineering Study, Proposed Soundview Technology Center, 36th Avenue West, Everett, <br /> Washington." Based on conditions encountered at the test sites explored by ESNW and review <br /> of previous subsurface explorations by others, subsurface conditions throughout the proposed <br /> development area of the site are comprised primarily of dense to very dense glacial till deposits. <br /> The planned development will include three concrete-tilt up warehouse buildings, paved parking <br /> areas, and associated infrastructure improvements. <br /> In our opinion, the proposed development is feasible from a geotechnical standpoint. <br /> Recommendations for earthwork, site preparation, retaining walls, foundations, pavement <br /> sections, and other pertinent geotechnical recommendations are provided in this study. <br /> The opportunity to be of service to you is appreciated. If you have any questions regarding the <br /> content of this geotechnical engineering study, please call. <br /> Sincerely, <br /> EARTH SOLUTIONS NW, LLC <br /> I �C? •/ - __ <br /> Brett J. P iebe, .I.T. <br /> Staff Engineer <br /> I <br /> 1805 - 136th Place N.E., Suite 201 • Bellevue, WA 98005 • (425)449-4704 • FAX(425)449-4711 <br />