Laserfiche WebLink
I <br />after five years), evidence for hydrology at the mitigation site, and the proposed buffer <br />widths; <br />(6) How it will be maintained and monitored to assess progress towards goals and objectives. <br />(7) Completion and submittal of an "as -built conditions repose" upon completion of grading, <br />planting and hydrology establishment at the mitigation site; <br />(8) Completion and submittal of monitoring reports at years 3 and 5 showing the results of <br />monitoring for hydrology, vegetation types, and aerial cover of vegetation. <br />(9) For forested and scrub -shrub wetlands, 10 years of monitoring will often be necessary. <br />(10) Documentation of legal site protection mechanism (covenant or deed restriction) to show <br />' how the compensatory mitigation site will be legally protected for the long-term. <br />I. An individual 401. certification is required for any activity where temporary fill will remain in <br />wetlands or other waterbodies for more than 90 days. The 90 day period begins when filling activity starts <br />in the wetland or other waterbody. <br />' J. An individual 401 is required for any proposed project or activity in waterbodies on the most <br />current list of the following Designated Critical Resource Waters (per Corps General Condition 22). <br />' K. An individual 401 certification is required for any proposed project that would increase permanent, <br />above -grade fill within the 100-year floodplain (including the floodway and the flood fringe). <br />' [Note: The 100-year floodplain is defined as those areas identified as Zones A, Al-30, AE, AIL <br />AO, A99, V, V 1-30, and VE on the most current Federal Emergency Management Agency Flood <br />Rate Insurance Maps, or areas identified as within the 100-year floodplain on applicable locAl <br />Flood Management Program maps. The 100-year flood is also known as the flood with a 100-year <br />' recurrence interval, or as the flood with an exceedance probability of 0.01.] <br />H. EPA 401 CERTIFICATION SPECIFIC CONDITIONS FOR THIS NWP: Denied. Individual 401 <br />' certification required. <br />1. COASTAL ZONE MANAGEMENT CONSISTENCY RESPONSE FOR THIS NWP: Concur subject <br />' to the following condition: When individual 401 review by Ecology is triggered, a CZM Certification of <br />Consistency form must be submitted for projects located within the 15 coastal counties (see State General <br />401 Condition 3 (Notification)). <br />L <br />20 <br />