My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5900 36TH AVE W SEPA 015 - 034 - SOUNDVIEW BUSINESS CAMPUS - VERITAS Land Use Decision Documents 2025-04-22
>
Address Records
>
36TH AVE W
>
5900
>
SEPA 015 - 034 - SOUNDVIEW BUSINESS CAMPUS - VERITAS
>
Land Use Decision Documents
>
5900 36TH AVE W SEPA 015 - 034 - SOUNDVIEW BUSINESS CAMPUS - VERITAS Land Use Decision Documents 2025-04-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 9:53:29 AM
Creation date
4/8/2025 3:24:57 PM
Metadata
Fields
Template:
Address Document
Street Name
36TH AVE W
Street Number
5900
Tenant Name
SEPA 015 - 034 - SOUNDVIEW BUSINESS CAMPUS - VERITAS
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
984
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ted W. Sykes, CESCL, CAC, CLP <br /> Continued <br /> Related Project Experience: ' <br /> Snohomish County Campus Redevelopment 3-COM Park (aka Candlestick Stadium) <br /> Everett, Washington San Francisco, California <br /> Designed and managed all aspects of asbestos, lead Managed the complete asbestos survey of more than <br /> paint, PCBs, and other hazardous materials abatement two million square feet of football stadium space prior <br /> from eight Snohomish County owned buildings to a scheduled Superbowl renovation update of the <br /> scheduled for demolition at their main campus in facility that subsequently never took place. This large <br /> Everett. Scope of services included preparing a project took me more than a month to complete. <br /> complete survey of the buildings; develop abatement <br /> specifications, pre-bid and contractor selection, full- <br /> time monitoring during abatement activities, and San Bruno County Correctional Facility <br /> preparing a close-out report at the completion of the San Bruno, California <br /> project. Managed the completionan asbestos &lead paint <br /> survey of an active prison facility for the City and <br /> Von's Distribution Center County of San Francisco. <br /> El Monte, California <br /> Completed an asbestos &lead paint survey of more than Costco Wholesale <br /> one million square feet of building space and managed <br /> the abatement of asbestos, PCBs, mercury, containerized Multiple Locations <br /> hazardous materials, and above ground fuel storage Managed the completion of Phase I ESAs, Phase ll <br /> tanks at Von's former kitchen warehouse building ESAs, &asbestos/lead paint surveys at more than <br /> scheduled to be demolished. 50 locations throughout Washington, British Columbia, <br /> Alberta, Saskatchewan, and Manitoba. <br /> The Landing Project <br /> Renton, Washington <br /> Completed a Phase 1 and Phase ll ESA of the entire Big Gulch Project <br /> Landing Project site which was occupied by Boeing at Mukilteo, Washington <br /> the time. Following the demolition of the Boeing facilities Prepared a SWPPP, TESC plan, and conducted <br /> occupying the site, I prepared a Stormwater Pollution weekly BMP inspections during a City of Mukilteo <br /> Prevention Plan (SWPPP), Temporary Erosion & Sediment storm water pipeline installation and creek restoration <br /> Control(TESC) Plan, and conducted weekly Best project that spanned more than five miles in length. <br /> Management Practices(BMP) inspections of the site The project took more than two years to complete. <br /> during construction of the present-day retail and multi- <br /> family complex. ' <br /> Gig Harbor Historical Society <br /> Spokane Street Viaduct Widening Project Gig Harbor, Washington <br /> Managed the successful remediation of soil and <br /> Seattle, Washington groundwater impacted with petroleum hydrocarbons <br /> Managed the completion of a SWPPP, TESC plan, and and vinyl chloride. Subsequently received an NFA <br /> conducted weekly BMP inspections for a year-long project determination from Department of Ecology <br /> that is still currently active. <br /> Walmart Development Safeway Distribution Center <br /> Chelan, Washington Auburn, Washington <br /> Prepared a Phase I and II ESA of a former apple orchard Prepared a Phase I ESA, Phase ll ESA, and asbestos/ <br /> site scheduled to be developed into a new Walmart retail lead paint survey of a large industrial complex owned <br /> store. Prepared a specification regarding the excavation, and occupied by Boeing for the development of a new <br /> handling, disposal, and contractor employee Safeway Distribution Center. No soil or groundwater <br /> decontamination procedures disturbing arsenic, lead, and contamination was discovered at the site, but I did <br /> DDT contaminated soil during site development. get selected to design and manage the removal of all <br /> Subsequently negotiated an NFA with Department of asbestos-containing materials from the buildings prior <br /> Ecology for the site following construction activities. to their demolition. <br />
The URL can be used to link to this page
Your browser does not support the video tag.