Laserfiche WebLink
S:\MBrick\development review\2015\09-Sept\PreApp15-032.xlsx <br />Printed:9/18/2015 1:00 PM <br />Project Name Soundview Business Campus Traffic Reviewer MGB <br />Project Location North end of 36th Ave W Dev Reviewer SF <br />Project Description 3 buildings totalling 542,660 SF Planner ii <br />Received Date 9/15/2015 Due Date 9/22/2015 Review Date 9/18/2015 File # PreApp 15-032 <br />Area Type EICBD <br />�X TRAFFIC STUDY OPTIONAL <br />�X SW Everett Remainder <br />Site Access <br />Check Sight Distance (From Table 1, attached) FTt Intersections E]At Driveways <br />HResidential Development - Vertical Clearance from 30" to 60" above pavement 10' from Back of Curb <br />Commercial Development - Vertical Clearance from 30" to 84" above pavement 15' from Back of Curb <br />HRight In / Right Out Turn Restriction at Condition of Permit Possible in Future <br />Access point requires traffic control device �X Stop Sign Yield Sign Signal Median/Island <br />X All roadways and driveways must meet City of Everett Design Standards <br />ccess point is public roadway, use City of Everett standard intersections <br />Access point is private roadway, use City of Everett standard driveway plans <br />Check access point Spacing -Adjacent Spacing -Opposite Throat Depth Grade <br />All access points must be paved <br />Reduce potential conflict points Access Points Street Intersections Driveway Cut <br />Access point requires realignment <br />Access points require consolidation <br />Shared access with adjacent property required <br />Provide pedestrian access to �X City Sidewalks ❑X All Building Doorways <br />Pedestrian facilities must be separated from vehicular traffic <br />I traffic control markings and devices on driveways within 50 feet of ROW shall be MUTCD compliant <br />X ISite circulation shall be private road network but intersection -style driveway treatments may be acceptable - DISCUSS <br />X I Reconstruction of existing cul-de-sac to conventional road acceptable if public -private boundary is clearly delineated <br />Site Circulation and Parking Issues <br />Provide project location map, including adjacent driveways, local and arterial intersections <br />Provide detailed site plan, including circulation and parking details <br />Reduce potential internal circulation conflicts <br />Provide at least _ Total Parking Spaces <br />Provide at least Visitor Parking Space <br />Provide parking analysis indicating total estimated parking demand for project <br />Parking layout must be consistent with City of Everett Standards <br />parking areas should be paved <br />Pedestrian route should be between parking rows and separated from vehicle drive surface <br />Provide commercial vehicle turn -around space / turning radius <br />Provide freight vehicle turn -around space / turning radius <br />Is freight loading/unloading zone required <br />Check dumpster locations with disposal company <br />City of Everett Staff Use Only <br />