Laserfiche WebLink
SFM I"�""�" <br />2INSTALLS PER DAY <br />Make two lmtalk perhaL pour new standard SFM INFINPV has fewer <br />maaltachic ILI lmtallationdrape assembled components <br />to get Lou on the root 40).taster. <br />1 <br />BETTER AESTHETICS <br />Install the Asom withthe aesthetics preferred oL homeowners. <br />wan integrated front tamtam end capshark componentand <br />recessed hardware. <br />MAXIMUM POWER DENSITY <br />di mix module onenfateonsto achieve optimal powermil <br />without Moumngthe Increased hill of materials labor and <br />attachments required hp ail <br />SYSTEM OVERVIEW <br />ffIPIAPWL <br />advance M1miNnpmvLLaa9h0Nmnalgllsrulm <br />LXIAPWL®u¢ <br />cmmcla'eN ekund omAsdvjNSN IPIMAUIL <br />AtImRsIPIMAPILa dvL AwRNeaimllpMvg2otl0e <br />r�IXIMMLRAMINI <br />MmlLO1V8 <br />SwmnodutalPIMAAIL. <br />45 MNIRIAIL <br />Cmmu6dvN6saalp[flS pmv@spmiM411anay cowling . <br />gRQ <br />Cmmcn'eNmWoi6dvN�pmvtlm-emiwmi emang. <br />ATLAoeEpspacEamawmoe <br />WHERRA81MI <br />ALI amolp MAciaani <br />BONDING AND ACCESSORIES <br />IPIAPAILLIPApB <br />Cwessant If far nol s9e0n. <br />IPIAPAILVLXMX6'fNIA <br />EtrAanclN emA IXIMAAILmd coal <br />XIBVLXRX6'fNIA <br />EplintallybNsmusof�ulm- <br />No <br />ONE <br />Bare souu alms NMI <br />UL2703 '', ;':L <br />20% FEWER ATTACHMENTS <br />case umeana ILI onevury project SIN INeNm mpmmsLuwer <br />attachments than allsmtems <br />u <br />RAIL OF AIIcIImIIS <br />30% LOGISTICS SAYINGS <br />WamewerSNUsand cumWet components. SLM INFIN IIV is easier to <br />stook Laslerte tamponand eazjerto mtm the roof. Plusmake more <br />emomnt use NLourventme fleet. <br />IN <br />1% <br />BLUE RAVEM1I <br />NABCEP <br />CERTIFIED <br />PV INSTALLATION <br />PROFESSIONALSam Gurney e <br />SPEC SHEET <br />so» woE55 <br />