My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1604 BROADWAY EL GARCIA MARKET 2025-04-11
>
Address Records
>
BROADWAY
>
1604
>
EL GARCIA MARKET
>
1604 BROADWAY EL GARCIA MARKET 2025-04-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2025 1:36:07 PM
Creation date
4/9/2025 9:00:06 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
1604
Tenant Name
EL GARCIA MARKET
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V V VL.V 11.4.11GI VVn1O IV1 VV1 I111101...CU1,1L,U11190 II,VIUU",y V,VUI.I 1 IL,11V la,1t UVV, V 01V11 O,all,1, -- V...111,1111101,71 GU vy KIAGA.ILL IV1_1..I'1,rAil 11911O I COOS VOII <br /> The following information is necessary to check a it application for compliance with the lighting syste rotors and electrical system requirements in the <br /> Washington State Energy Code,Commercial Pros. <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> (',r,)8.1,2 (omn,is.<omiu Include general summary of Cx plan per <br /> (. 1 i.l.2.i €aquircrt tents in t t 408 1.2 iinelud ag 1)Narrative deseraptiorn <br /> { <br /> r-tus.1.4 construction of ;€ct€vitie_.2;)Responsibilities of the Cx • <br /> E.ii“.().3 doeurnrnts team;3)Schedule of activities including <br /> • <br /> verification of project close out <br /> dotututetnatiott to r?•(- 103.6: ,1 Conflict of <br /> interest plan(it reviled) <br /> ' (I li4s.1._ ( gm;ti, etiug Include in general summary that a Cx project <br /> C Itls I 4 tegmr&uteats to report and Compliance Checklist(Figure <br /> ( 103.6. construction t C40-8.1.4.1)shall be completed by the <br /> ct +ttri eats Certified Cx Professional and provided to the i <br /> owner pi tor to the(Mal electrical inspection <br /> NA E C408.4.1 ! Functional Identify in plans and specifications the <br /> performance testing intended operation of all equipment and <br /> criteria controls during all modes of operation, <br /> • <br /> including interfacing between new and • <br /> existing-to-remain systems <br /> PROJECT CLOSE OUT DOCUMENTATION <br /> NA i C103.6.3 Project close out Indicate in plans that project close out <br /> documentation documentation is required including WSEC <br /> • <br /> requirements lighting compliance reports that document all <br /> interior and exterior lighting area and/or <br /> surface types,lighting power allowances and <br /> installed densities <br /> I If"no"is selected for any question,provide explanation. <br /> 13Ihu <br />
The URL can be used to link to this page
Your browser does not support the video tag.