My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3726 BROADWAY MOUNTAIN PACIFIC BANK 2025-04-11
>
Address Records
>
BROADWAY
>
3726
>
MOUNTAIN PACIFIC BANK
>
3726 BROADWAY MOUNTAIN PACIFIC BANK 2025-04-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2025 1:47:53 PM
Creation date
4/9/2025 9:16:35 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3726
Tenant Name
MOUNTAIN PACIFIC BANK
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VERETT <br />0 <br />Permit Number: B2302-084 <br />Applied: 2/17/2023 <br />Issued: 4/4/2023 <br />Status: FINALED <br />Parent Permit: <br />Parent Project: <br />Details <br />Permit Inspections <br />City of Everett <br />Approved:4/3/2023 <br />Fi n a I ed : 9/13/2023 <br />Description: TI-NEW INTERIOR PARTITION WALLS, ACOUSTICAL <br />CEILING,CASEWORK <br />Site Address: 3726 BROADWAY STE 108 <br />City, State Zip Code: EVERETT, WA 98201 <br />Applicant: MILES WALKER, BNH ARCHITECT <br />Owner: MPB GATEWAY CENTER LLC <br />Contractor: GAMUT 360 GENERAL CONTRS LLC <br />SCHEDULED DATE <br />COMPLETED DATE <br />TYPE <br />INSPECTOR <br />RESULT <br />REMARKS <br />6/9/2023 <br />6/9/2023 <br />BLDG 08-FRAMING <br />Matt Schreifels <br />PARTIAL <br />APPROVAL <br />Notes: <br />360-708-2018 <br />jbmayhew3@gmail.com <br />Excludes kitchen & restroom. DO NOT INSULATE OR COVER IN THOSE AREAS. Schedule framing inspection once plumbing has approved rough -in. <br />6/15/2023 <br />6/15/2023 <br />BLDG 08-FRAMING <br />Matt Schreifels <br />APPROVAL <br />Notes: <br />360-708-2018 <br />jbmayhew3@gmail.com <br />Pulled Inspection forward from 6/16/23 to 6/15/23 <br />6/21/2023 <br />6/21/2023 <br />BLDG 10-DRYWALL <br />Matt Schreifels <br />APPROVAL <br />NAILING <br />Notes: <br />360-708-2018 <br />jbmayhew3@gmail.com <br />pulled froward from 6/22/23 to 6/21/23 (MS) <br />7/25/2023 <br />T7/25/2023 <br />BLDG 13-CEILING <br />Matt Schreifels <br />APPROVAL <br />GRID <br />Notes: <br />360-708-2018 <br />jbmayhew3@gmail.com <br />9/6/2023 <br />F 9/6/2023 <br />BLDG 16-FINAL <br />Matt Schreifels <br />NOT READY <br />Notes: <br />Get final inspection approval for all outstanding sub -permits (3 electrical, 1 plumbing & 1 fire suppression permits). Once all sub -permits have final <br />approval reschedule for building final inspection. <br />9/6/2023 <br />9/6/2023 <br />FIRE 03-BLDG FINAL <br />BRONSON <br />APPROVAL <br />FOR FIRE <br />PEARSON <br />Notes: <br />�A_ <br />Printed: Tuesday, 26 September, 2023 1 of 2 rk <br />SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.