Laserfiche WebLink
Intake &Approval Sheet .(FOR PERMIT STAFF ONLY) PERMIT# �1 —30 L- 0 4- <br /> BUILDING lik.AINNING <br /> Intake OK by: Date: Intake OK by: Assign To: Date: <br /> Intake Comments: Intake Comments: <br /> ZonerviU <br /> Overlay/Agreement <br /> ❑ Route to Commercial Building Nonresidential Use _ 4 r <br /> ❑ Route to Residential Building Residential Use <br /> ❑ Make this a"W"Permit Proposed No. of Dwelling Units: <br /> Bldg/TI/Addn/Rem Size Z�/63 $"f Total No.of Dwelling Units: <br /> Garage/Accessory Struct.Size /t/%d Planning/Landscape Inspection Required before Final? ❑Yes ❑No <br /> Number of Stories 3 "In Lieu"Fee: Type: Amount$ <br /> Basement ENo ❑Yes , Fin/Unfin School Impact Fee: Total $ <br /> Type of Construction V.3 Calculated: Credit: <br /> Occupancy Group .5 ❑Everett School Dist ❑Mukilteo School Dist <br /> Occupancy Load `e-1-- Park Impact Fees for permits applied for after 1/1/2022: <br /> Fire Sprinklers: aUpdate Existing ❑New System ❑Not Req'd Park Impact Fee Total$ (net due after credit for existing uses) <br /> Reason Sprinklers Required: Fee Schedule Used For Calculation(Year): <br /> Fire Alarm: Update Existing ['New System ❑Not Req'd Permit Technician Use Only:Apply Phase-In Credit Per EMC19.53.200 <br /> Reason Fire Alarm Required: 0 100%Credit-Issued 1/1/2022-9/2/2022 <br /> RCW 64.55 MF worksheet req'd for permit? ❑Yes 123 No 0 50%Credit-Issued 9/3/2022-6/2/2023 <br /> Add'I RCW 64.55 docs required prior to final? ❑Yes EtNo 0 0%Credit-Issued 6/3/2023 or later <br /> VALUATION CALCULATION: Total$ / Dao.OJ Additional Notes: <br /> Approved By: Date: <br /> • PUBLIC WORKS <br /> Additional Notes: Intake OK by: Date: <br /> Intake Comments: PW Worksheet Needed if: <br /> OSys Dev Eval(Util/SW)OTraffic Mit Eval <br /> Approved By Date: 6qg70Z3 OSite Work/Drainage DAddress Letter <br /> DBackflow Prevention for high hazard: <br /> (dental,medical,animals,mortuary,hospital, <br /> FIRE DEPARTMENT supportive housing) <br /> FaSe rate/Deferred Submittals Required: El Route this folder for PW Review at end ---PW Review Worksheet <br /> ire Sprinklers Fire Alarm ❑Other: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> Additional Notes: AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br /> ❑This Permit is Approved by Public Works <br /> Fire Dept.Fees: ❑See PW Review Worksheet and associated attached items <br /> ❑ Review of As-Built Plans-NO FIRE FEE ❑A Separate PW Permit is Required(Permit#:PW <br /> ❑ Minimal or No Fire Scope-NO FIRE FEE AND ❑ Is located in this folder <br /> ►2-Review/Inspection Scope-ADD FIRE FEE ElIs in a Separate Green Folder Gain with this folder for permit issuance) <br /> Approved By: RJ-cc ,t)v( Date: %S^ (j- 3 CI Will be issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> ❑ Public Works has no scope---PW Not Required <br /> ELECTRICAL/PLUMBING Additional Notes: <br /> Additional Notes: <br /> Approved By: Date: Completed By: Date: <br />