My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3726 BROADWAY MOUNTAIN PACIFIC BANK 2025-04-11
>
Address Records
>
BROADWAY
>
3726
>
MOUNTAIN PACIFIC BANK
>
3726 BROADWAY MOUNTAIN PACIFIC BANK 2025-04-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2025 1:47:53 PM
Creation date
4/9/2025 9:16:35 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3726
Tenant Name
MOUNTAIN PACIFIC BANK
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Insulation Arrangement <br />Hydrostatic Test <br />PASS FAIL N/A <br />1. Scheduling -The contractor shall schedule for the inspection using eTRAKiT online ❑ ❑ ❑ <br />permitting portal. Inspection requests submitted online before 11:59 p.m. on <br />Monday -Friday will be tentatively scheduled for the next business day. <br />2. 2 Hour Test- A member of the Fire Marshal's Office will contact the contractor to ❑ ❑ ❑ <br />schedule a time for the inspection. The contractor is responsible for verifying that <br />all piping and attached equipment to the system subjected to system working <br />pressure has been under 200 psi of pressure for a minimum of 2 hours prior to the <br />inspection. Example: Timestamped photograph of pressure gauge. (Loss shall be <br />determined by a drop in the gauge pressure or visual leakage.) <br />3. High Pressure Systems - Portions of systems normally subjected to system ❑ ❑ ❑ <br />working pressures in excess of 150 psi shall be tested at a pressure of 50 psi in <br />excess of system working pressure. <br />4. FDC Piping - Piping between the exterior FDC and the check valve in the fire ❑ ❑ ❑ <br />department inlet pip shall be hydrostatically tested in the same manner as the <br />balance of the system. <br />5. Release Pressure - After verifying that the system has maintained the required 200 ❑ ❑ ❑ <br />psi for 2 hours, release pressure and confirm the test gauge returns to zero. (A <br />gauge that does not return to zero could be an indication that the gauge was <br />pegged.) <br />Fire Marshal's Office 1425.257.8100 1 everettwa.gov/fire I INFORMATION HANDOUT C-6 14.13.2020 1 Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.